Exam 21: Material Requirements Planning
Exam 1: Introduction84 Questions
Exam 2: Strategy54 Questions
Exam 3: Design of Products and Services58 Questions
Exam 4: Project Management78 Questions
Exam 5: Strategic Capacity Management64 Questions
Exam 6: Learning Curves60 Questions
Exam 7: Manufacturing Processes44 Questions
Exam 8: Facility Layout58 Questions
Exam 9: Service Processes67 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis57 Questions
Exam 12: Six Sigma Quality75 Questions
Exam 13: Statistical Quality Control73 Questions
Exam 14: Lean Supply Chains73 Questions
Exam 15: Logistics Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement78 Questions
Exam 17: Enterprise Resource Planning Systems47 Questions
Exam 18: Forecasting101 Questions
Exam 19: Sales and Operations Planning65 Questions
Exam 20: Inventory Management108 Questions
Exam 21: Material Requirements Planning89 Questions
Exam 22: Workcenter Scheduling72 Questions
Exam 23: Theory of Constraints72 Questions
Exam 24: Health Care69 Questions
Exam 25: Operations Consulting61 Questions
Select questions type
One of the main purposes of an MRP system is which of the following?
(Multiple Choice)
4.8/5
(85)
If annual demand is 1,000 units, annual holding cost is $0.50 per unit, and the cost per order is $10, what is the EOQ? ______________________________________
(Short Answer)
4.9/5
(80)
"Projected available balance" is a term referring to unsold finished goods inventory.
(True/False)
5.0/5
(71)
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
(True/False)
4.8/5
(70)
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?
(Multiple Choice)
4.8/5
(64)
The lot-for-lot (L4L) lot-sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
(True/False)
4.8/5
(77)
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup cost, carrying cost, and cost of stockouts.
(True/False)
5.0/5
(59)
Which of the following is one of the main purposes of an MRP system?
(Multiple Choice)
4.9/5
(71)
The economic order quantity (EOQ) lot-sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
(True/False)
4.9/5
(80)
Which of the following is not a lot-sizing technique used in MRP systems?
(Multiple Choice)
4.8/5
(73)
The least unit cost method of lot-sizing adds ordering, stockout, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
(True/False)
5.0/5
(64)
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
(True/False)
4.9/5
(88)
Net change MRP reflects the exact status of each item managed by the system in "real time."
(True/False)
4.8/5
(78)
Low-level coding in MRP indicates the exact status of each item managed by the system in "real time."
(True/False)
4.9/5
(57)
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
(True/False)
4.9/5
(86)
The three main inputs to an MRP system are the bill of materials, the master schedule, and the inventory records file.
(True/False)
4.9/5
(84)
Which of the following is considered a primary report in an MRP system?
(Multiple Choice)
4.9/5
(71)
Which of the following is considered a secondary report in an MRP system?
(Multiple Choice)
4.8/5
(84)