Exam 25: Budgetary Control and Responsibility Accounting

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

If actual costs are greater than standard costs, there is a(n)

(Multiple Choice)
4.8/5
(70)

Standard cost cards are the subsidiary ledger for the Work in Process account in a standard cost system.

(True/False)
4.8/5
(79)

The purchasing agent of the Aldrich Company ordered materials of lower quality in an effort to economize on price. What variance will most likely result?

(Multiple Choice)
4.7/5
(70)

The customer perspective of the balanced scorecard approach

(Multiple Choice)
4.8/5
(75)

A total materials variance is analyzed in terms of

(Multiple Choice)
4.9/5
(92)

Presented below is a flexible manufacturing budget for Jacob Company, which manufactures fine timepieces: Activity Index: The company applies the overhead on the basis of direct labor hours at $7.00 per direct labor hour and the standard hours per timepiece is 1/2 hour each. The company's actual production was 5,800 timepieces with 2,900 actual hours of direct labor. Actual overhead was $21,200. Instructions (a) Compute the controllable and volume overhead variances. (b) Prepare the entries for manufacturing overhead during the period and the entry to recognize the overhead variances at the end of the period.

(Essay)
4.8/5
(69)

The direct materials quantity standard would not be expressed in

(Multiple Choice)
4.8/5
(77)

The standard rate of pay is $10 per direct labor hour. If the actual direct labor payroll was $39,200 for 4,000 direct labor hours worked, the direct labor price (rate) variance is

(Multiple Choice)
4.9/5
(78)

The formula for the materials quantity variance is

(Multiple Choice)
4.8/5
(78)

Which one of the following statements is true?

(Multiple Choice)
4.8/5
(80)

The final decision as to what standard costs should be is the responsibility of

(Multiple Choice)
4.9/5
(73)

Standards based on the optimum level of performance under perfect operating conditions are

(Multiple Choice)
4.8/5
(74)

Which of the following is not considered an advantage of using standard costs?

(Multiple Choice)
4.9/5
(75)

A company purchases 15,000 pounds of materials. The materials price variance is $6,000 favorable. What is the difference between the standard and actual price paid for the materials?

(Multiple Choice)
4.7/5
(90)

Gamblian Company's standard labor cost of producing one unit of product is 2 hours at the rate of $14.00 per hour. During February, 39,000 hours of labor are incurred at a cost of $13.80 per hour to produce 19,000 units of product. Instructions (a) Compute the labor price and labor quantity variances. (b) Journalize the incurrence of the labor costs and the assignment of direct labor to production, assuming a standard cost system is used.

(Essay)
4.9/5
(73)

If the standard hours allowed are less than the standard hours at normal capacity, the volume variance

(Multiple Choice)
4.8/5
(82)

The standard rate of pay is $15 per direct labor hour. If the actual direct labor payroll was $88,200 for 6,000 direct labor hours worked, the direct labor price (rate) variance is

(Multiple Choice)
4.8/5
(84)

If standard costs are incorporated into the accounting system,

(Multiple Choice)
4.8/5
(67)

Match the items in the two columns below by entering the appropriate code letter in the space provided. A. Variances F. Materials price variance B. Standard costs G. Labor quantity variance C. Standard cost accounting system H. Overhead controllable variance D. Normal standards I. Overhead volume variance E. Ideal standards J. Standard hours allowed ____ 1. The difference between actual overhead incurred and overhead budgeted for the standard hours allowed. ____ 2. The hours that should have been worked for the units produced. ____ 3. The difference between the actual quantity times the actual price and the actual quantity times the standard price. ____ 4. The difference between total actual costs and total standard costs. ____ 5. The difference between actual hours times the standard rate and standard hours times the standard rate. ____ 6. Predetermined unit costs that are measures of performance. ____ 7. The difference between normal capacity hours and standard hours allowed times the fixed overhead rate. ____ 8. Standards based on an efficient level of performance that are attainable under expected operating conditions. ____ 9. Standards based on the optimum level of performance under perfect operating conditions. ____ 10. A double-entry system of accounting in which standard costs are used in making entries and variances are recognized in the accounts.

(Short Answer)
4.9/5
(92)

Markowitz Corporation prepared the following variance report. Markowitz Corporation prepared the following variance report.    Instructions Fill in the appropriate amounts or letters for the question marks in the report. Instructions Fill in the appropriate amounts or letters for the question marks in the report.

(Essay)
4.8/5
(80)
Showing 81 - 100 of 207