In a Kanban system,materials may be withdrawn without a withdrawal card if the operation requiring the material is about to run out of work.

(True/False)
4.7/5
(76)

The lean system concept will not work without the proper environment.Which one of the following characteristics is most common to firms that have successfully implemented a lean system?

(Multiple Choice)
5.0/5
(68)

A Kanban is a card used to control the flow of production in many just-in-time systems.

(True/False)
4.8/5
(90)

Regarding the Eight Types of Waste that must be eliminated to implement lean systems,manufacturing an item before it is needed is part of which general waste category?

(Multiple Choice)
4.9/5
(68)

Case 8.3 Mike's Mustard Company uses a Kanban system to manufacture bulk mustard in gallon containers for restaurants.The demand for container lids over an eight-hour production day is 1000 units.The average waiting time for a container of lids is 45 minutes.The processing time for a container of lids is 2 hours,and a container holds 70 lids. -Use the information in Case 8.3.How many Kanban containers would Mike's Mustard require if the containers held only 15 pieces and a 5% policy variable is declared?

(Multiple Choice)
5.0/5
(89)

Toyota sets up all of its operations as experiments and teaches employees at all levels how to use the trial and error method of problem solving.

(True/False)
4.8/5
(87)

Case 8.3 Mike's Mustard Company uses a Kanban system to manufacture bulk mustard in gallon containers for restaurants.The demand for container lids over an eight-hour production day is 1000 units.The average waiting time for a container of lids is 45 minutes.The processing time for a container of lids is 2 hours,and a container holds 70 lids. -Use the information in Case 8.3.How many Kanban containers would Mike's Mustard require if a 5% policy variable is used?

(Multiple Choice)
4.7/5
(83)

An item sells at a rate of 240 units per day.If a plant works one shift per day (480 minutes),what takt time is required for the plant to meet this demand?

(Essay)
4.7/5
(85)

The just-in-time (JIT)system is a(n):

(Multiple Choice)
4.7/5
(76)

The just-in-time (JIT)philosophy is the belief that cutting inventory and removing non-value-added activities in operations can eliminate waste.

(True/False)
4.9/5
(77)

Which of the following is NOT a barrier for an organization when implementing a lean system?

(Multiple Choice)
4.9/5
(67)

Five S practices can be applied to both manufacturing and service settings and can include offices,work spaces,tool rooms,and shop floors.

(True/False)
4.9/5
(97)

Happiness,Inc.uses a Kanban system.The daily demand for the most critical part,the Smylie,is 400 units over an eight-hour production period.The average waiting time for a container of Smylies is 30 minutes.The processing time for a container filled with Smylies is 6 minutes,and a container holds 5 units.If the company wishes to use a 5% policy variable,how many containers are needed?

(Essay)
4.8/5
(88)

A Kanban system is an important mechanism for lean system management.Which one of the following statements regarding the operation of a Kanban system is best?

(Multiple Choice)
5.0/5
(80)

Which one of the following is an advantage of lean systems?

(Multiple Choice)
4.8/5
(78)

________ is a graphic representation of the Toyota Production System showing all of the essential elements of lean systems that make the TPS work well.

(Essay)
4.9/5
(81)

What are the supply chain implications of the lean system emphasis on small lot sizes?

(Essay)
4.8/5
(73)

Value stream maps consist of a(n)________,a(n)________,and a(n)________.

(Essay)
5.0/5
(78)

Items to be assembled that fit together only the proper way are an example of:

(Multiple Choice)
4.9/5
(70)

Jones Electric Motors uses a Kanban system to make motors for several garage door companies in the southeastern United States.The daily demand for motor housings used in manufacturing is 100 units.The average waiting time for a container of parts is 0.2 day.The processing time for a container of housings is 0.1 day,and a container holds 5 housings.If Jones wishes to use a 10% policy variable,how many containers are needed?

(Essay)
4.7/5
(80)