The goal of single-digit setup is to have a setup completed in fewer than 10 hours.

(True/False)
4.8/5
(70)

Burdell Salad Dressings uses a Kanban system.The daily demand for corrugated boxes used in packaging its dressings is 300 boxes.The average waiting time for a container of boxes is 0.25 day.The processing time for a container of boxes is 0.1 day,and a container holds 10 boxes.If Burdell wishes to use a 10% policy variable,how many containers are needed?

(Essay)
4.8/5
(73)

When determining the number of kanban containers,discuss the impact of alpha,the policy variable,on the total amount of inventory in the system.If alpha is set equal to zero,is system inventory zero? What would be required to achieve a system-wide inventory of zero?

(Essay)
4.9/5
(81)

Continuous improvement with lean systems:

(Multiple Choice)
4.9/5
(74)

Companies using lean systems generally have:

(Multiple Choice)
4.8/5
(80)

Firms that have highly repetitive processes and well-defined work flows of standardized items often use the pull method.

(True/False)
4.9/5
(73)

After the earthquake and tsunami of 2011,Toyota's suppliers and plants were able to maintain production levels due to their efficiency.

(True/False)
4.8/5
(85)

Lean systems maintain inventory in small lot sizes because small lot sizes:

(Multiple Choice)
4.7/5
(75)

Quality at the source is a philosophy whereby defects are caught and corrected where they are created.

(True/False)
4.8/5
(94)

The production of 240 units during a 480-minute work shift results in a takt time of:

(Multiple Choice)
4.9/5
(83)

________ is a methodology consisting of five workplace practices that are conducive to visual controls and lean production.

(Essay)
4.7/5
(69)

Preventive maintenance is typically given very low priority in just-in-time systems.

(True/False)
4.9/5
(94)

Case 8.2 The Jewel Golf Club Company,which recently began using a Kanban system,has had problems with high inventory levels of one of the handle grips used to make several versions of its clubs.Daily demand for the grip is 3000 units,average waiting time during production is 0.20 day,processing time is 0.10 day per container,and a container holds 150 grips. -Use the information in Case 8.2.How many Kanban containers would Jewel require if a 5% policy variable is used?

(Multiple Choice)
4.9/5
(85)

Regarding the Eight Types of Waste that must be eliminated to implement lean systems,using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?

(Multiple Choice)
5.0/5
(74)

Which of the following statements about the Toyota Production System is best?

(Multiple Choice)
4.8/5
(88)

Regarding the Eight Types of Waste that must be eliminated to implement lean systems,which of the following statements is TRUE?

(Multiple Choice)
4.7/5
(87)

What are the organizational issues companies must address before implementing a lean system?

(Essay)
4.8/5
(74)

Use of value stream mapping requires construction of a current state drawing,a future state drawing,and an implementation plan.

(True/False)
4.8/5
(74)

The four bolts that hold the passenger seat in a pickup truck are tightened in a clockwise order beginning with the front right bolt in 24 seconds.This production factoid illustrates which of the following principles of the Toyota Production System?

(Multiple Choice)
4.7/5
(87)

In the Toyota Production System,all work must be completely specified as to ________,________,________ and ________.

(Essay)
4.9/5
(78)