Exam 8: Lean Systems
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
If the inventory advantages of a lean system are to be realized,small lot sizes must be used;in order to use small lot sizes,manufacturers must significantly reduce ________ .
(Essay)
4.8/5
(72)
________ are operating systems that maximize the value added of each of their activities by paring unnecessary resources and delays from them.
(Essay)
4.9/5
(76)
The production of 300 units during a 480-minute work shift results in a takt time of:
(Multiple Choice)
4.8/5
(78)
A firm that averages sales of 320 units for every 480-minute shift it runs has a takt time of 90 seconds.
(True/False)
4.9/5
(77)
________ practices include early testing of machine parts that may need to be replaced and making workers responsible for routine minor maintenance of their own equipment.
(Essay)
4.9/5
(86)
The pathway for every service and product in the Toyota Production System must be ________ and ________.
(Essay)
4.8/5
(87)
All improvements to the Toyota Production System must be made using the ________ method.
(Essay)
4.7/5
(86)
Case 8.3
Mike's Mustard Company uses a Kanban system to manufacture bulk mustard in gallon containers for restaurants.The demand for container lids over an eight-hour production day is 1000 units.The average waiting time for a container of lids is 45 minutes.The processing time for a container of lids is 2 hours,and a container holds 70 lids.
-Use the information in Case 8.3.How many Kanban containers would be required if a 15% policy variable is used?
(Multiple Choice)
4.7/5
(68)
One tactic of Total Preventive Maintenance (TPM)is to make workers responsible for routine minor maintenance of their own equipment.
(True/False)
4.8/5
(81)
What is the output for a process that has a takt time of 1.25 minutes per unit?
(Essay)
4.9/5
(87)
________ refers to mistake-proofing methods aimed at designing fail-safe systems that minimize human error.
(Essay)
4.8/5
(85)
The Toyota Production System requires that any process improvements are to be made at the lowest level of the organization.
(True/False)
4.7/5
(88)
A system that organizes the resources,information flows,and decision rules that enable a firm to realize the benefits of JIT principles is the ________.
(Essay)
4.8/5
(91)
In lean systems,work-in-process inventory is a direct result of overproduction and waiting.
(True/False)
5.0/5
(73)
Which one of the following statements regarding the Toyota production system is best?
(Multiple Choice)
4.8/5
(74)
The theory of constraints accepts existing system bottlenecks and works to maximize throughput given these constraints,while value stream mapping endeavors to understand how existing processes can be altered to eliminate bottlenecks and other wasteful activities.
(True/False)
4.9/5
(83)
Takt time is the cycle time needed to maximize utilization of an organization's workers and equipment.
(True/False)
4.7/5
(73)
Case 8.1
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys.The waiting time for a container of the wheels during production is 0.25 day;average processing time is 0.15 day per container.Each container holds 200 wheels.The company uses 2000 wheels a day in the production of its products.
-Use the information in Case 8.1.How many Kanban containers would be required if a 10% policy variable is used?
(Multiple Choice)
4.9/5
(68)
A method in which production of an item begins in advance of customer needs is called:
(Multiple Choice)
4.8/5
(73)
Showing 101 - 120 of 179
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)