Exam 8: Lean Systems
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
A one-person cell in which a worker operates several different machines simultaneously to achieve a line flow is called a one-worker,multiple-machines (OWMM)cell.
(True/False)
4.9/5
(80)
Just-in-time (JIT)systems need close relationships with suppliers.
(True/False)
4.9/5
(100)
The Peeps factory can be described as a three step process consisting of Mixing,Forming,and Packaging.Peeps are made in batches of 1000 and have a daily demand of 75,000 units during what the plant manager likes to call "the Peep season." Mixing has a cycle time of .02 seconds with a setup time of 30 seconds;Forming has a setup time of 24 seconds and a cycle time of .03 seconds,and Packaging has a setup time of 15 seconds with a cycle time of .04 seconds.Each process step is handled by one operator,who is available for 8 hours a day.What is the process bottleneck if each process step is assumed to have 100% uptime?
(Essay)
4.7/5
(98)
The Japanese practice of andon means that production does not begin until a card or bin is empty.
(True/False)
4.8/5
(76)
A five S program includes the activities of "simplify" and "system."
(True/False)
4.8/5
(79)
What is the difference between the "push" and "pull" methods of material flow? Which method does lean systems use?
(Essay)
4.7/5
(72)
Lean systems use the standardization of components because standardization:
(Multiple Choice)
4.9/5
(80)
A ________ is a workstation in which a worker operates several different machines simultaneously to achieve a line flow.
(Essay)
4.8/5
(74)
In a lean system,wait times can be caused to some extent by long production runs.
(True/False)
4.8/5
(79)
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,excessive movement and material handling of product between processes is part of which general waste category?
(Multiple Choice)
4.7/5
(92)
The value stream mapping tool often requires completion of the future state drawing before the current state drawing,to help managers see the future state goals and more easily identify problems with the current state of the process.
(True/False)
4.8/5
(81)
In the Toyota Production System,when a work station needs more material,it is obvious to both the worker and the supplier that material is needed.Further,the amount needed must be understood as well as the delivery time for replenishment.
(True/False)
4.8/5
(72)
Champion Cooling Company uses a kanban system at their location in the Oklahoma City Metroplex.The daily demand for fans is 2000 and management insists on using an alpha level of 0.1.They use containers that hold 20 items and takes 0.04 of a day to process.It takes 0.07 of a day to get a container filled and for it to wait during its cycle.How many containers should they use? If they use the nearest integer value number of containers,what is the actual system alpha?
(Essay)
4.8/5
(72)
In a lean system,large inventories are not considered a type of waste,because they prevent operator wait times.
(True/False)
4.9/5
(87)
Case 8.1
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys.The waiting time for a container of the wheels during production is 0.25 day;average processing time is 0.15 day per container.Each container holds 200 wheels.The company uses 2000 wheels a day in the production of its products.
-Use the information in Case 8.1.Using a policy variable of 5%,calculate the number of Kanban containers needed for the wheels.
(Multiple Choice)
5.0/5
(77)
________ refers to a form of supplier partnership that places a supplier representative,who is empowered to plan and schedule the replenishment of materials from the supplier,in the customer's plant on a full-time basis.
(Essay)
4.9/5
(83)
A ________ is based on both a withdrawal card and a production-order card,to control inventory quantities more closely.
(Essay)
4.8/5
(84)