Exam 7: Manufacturing Processes
Exam 1: Introduction84 Questions
Exam 2: Strategy54 Questions
Exam 3: Design of Products and Services58 Questions
Exam 4: Project Management78 Questions
Exam 5: Strategic Capacity Management64 Questions
Exam 6: Learning Curves60 Questions
Exam 7: Manufacturing Processes44 Questions
Exam 8: Facility Layout58 Questions
Exam 9: Service Processes67 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis57 Questions
Exam 12: Six Sigma Quality75 Questions
Exam 13: Statistical Quality Control73 Questions
Exam 14: Lean Supply Chains73 Questions
Exam 15: Logistics Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement78 Questions
Exam 17: Enterprise Resource Planning Systems47 Questions
Exam 18: Forecasting101 Questions
Exam 19: Sales and Operations Planning65 Questions
Exam 20: Inventory Management108 Questions
Exam 21: Material Requirements Planning89 Questions
Exam 22: Workcenter Scheduling72 Questions
Exam 23: Theory of Constraints72 Questions
Exam 24: Health Care69 Questions
Exam 25: Operations Consulting61 Questions
Select questions type
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
(Essay)
4.9/5
(83)
The closer the customer is to the customer order decoupling point, the more quickly the customer receives the product.
(True/False)
5.0/5
(75)
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
(True/False)
4.8/5
(81)
The closer the customer is to the customer order decoupling point, the longer it takes the customer to receive the product.
(True/False)
4.8/5
(84)
A difference between project and continuous flow categories of process flow structures is which of the following?
(Multiple Choice)
4.8/5
(84)
Which of the following basic types of process structures is one in which similar equipment or functions are grouped together?
(Multiple Choice)
4.8/5
(91)
Which of the following is a basic type of process structure?
(Multiple Choice)
4.9/5
(64)
The time needed to respond to a customer's order is called the customer response time.
(True/False)
4.9/5
(91)
Which of the following is not a step in developing a manufacturing cell layout?
(Multiple Choice)
4.8/5
(80)
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
(True/False)
4.8/5
(82)
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
(True/False)
4.9/5
(82)
One trade-off illustrated by the product-process matrix is between flexibility and cost.
(True/False)
5.0/5
(79)
Assemble-to-order means moving the customer order decoupling point from finished goods to components.
(True/False)
4.8/5
(72)
Break-even analysis can be used to help decide whether to perform a task with a special-purpose machine or with a general-purpose machine.
(True/False)
4.8/5
(82)
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
(True/False)
4.9/5
(67)
One methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is break-even analysis.
(True/False)
4.9/5
(81)
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10, and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break even?
(Multiple Choice)
4.9/5
(79)
In a work center, machine A has a 10-minute set-up time per batch and a 2-minute per unit run time.Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit.The work center makes products in batches ranging from 1 unit to 100 units.Assuming capacity is not a limitation on either machine, in order to minimize the total processing time, on which batches should machine B be used?
(Multiple Choice)
4.9/5
(79)