Exam 3: Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is NOT a limitation of PERT?

(Multiple Choice)
4.9/5
(81)

Work breakdown structure is a useful tool in project management because it addresses the timing of individual work elements.

(True/False)
4.7/5
(70)

Every network has at least one critical path.

(True/False)
5.0/5
(74)

Identify the responsibilities of project managers.

(Essay)
4.8/5
(73)

Ethical issues that can arise in projects include gifts from contractors,pressure to mask delays with false status reports,and pressure to compromise project quality to meet bonuses or avoid penalties related to schedules.

(True/False)
5.0/5
(73)

Which of the following statements regarding PERT times is true?

(Multiple Choice)
4.7/5
(73)

The network below represents a project being analyzed by the critical path method.Activity durations are indicated on the network. The network below represents a project being analyzed by the critical path method.Activity durations are indicated on the network.   a.Identify the activities on the critical path. b.What is the duration of the critical path? c.Calculate the amount of slack time at activity H. d.If activity I were delayed by ten time units,what would be the impact on the project duration? a.Identify the activities on the critical path. b.What is the duration of the critical path? c.Calculate the amount of slack time at activity H. d.If activity I were delayed by ten time units,what would be the impact on the project duration?

(Essay)
4.9/5
(78)

What are the earliest activity start time and latest activity start time,and how are they computed?

(Essay)
4.8/5
(78)

A contractor's project being analyzed by PERT has an estimated time for the critical path of 120 days.The sum of all activity variances is 81; the sum of variances along the critical path is 64.What is the probability that the project will take 130 or more days to complete?

(Multiple Choice)
4.7/5
(90)

Consider the network described in the table below. Consider the network described in the table below.    a.Calculate the expected duration of each activity. b.Calculate the expected duration and variance of the critical path. c.Calculate the probability that the project will be completed in fewer than 30 time units. a.Calculate the expected duration of each activity. b.Calculate the expected duration and variance of the critical path. c.Calculate the probability that the project will be completed in fewer than 30 time units.

(Essay)
4.8/5
(76)

Which of the following statements regarding CPM networks is true?

(Multiple Choice)
4.9/5
(78)

A combination of effective Gantt chart use and other tactics allowed Delta to cut the average time for a plane layover by what % of the original 60 minute duration?

(Multiple Choice)
4.9/5
(72)

The standard deviation of project duration is the average of the standard deviation of all activities on the critical path.

(True/False)
4.9/5
(66)

The control of projects involves close monitoring of which of the following?

(Multiple Choice)
4.7/5
(79)

What are some of the ethical issues faced by project managers?

(Essay)
4.7/5
(83)

The beta distribution is used in project management to:

(Multiple Choice)
4.7/5
(81)

A local project being analyzed by PERT has 42 activities,13 of which are on the critical path.If the estimated time along the critical path is 105 days with a project variance of 25,what is the probability that the project will be completed in 95 days or less?

(Multiple Choice)
4.8/5
(79)

Which of the following statements regarding Bechtel is true?

(Multiple Choice)
4.9/5
(62)

Given the critical path below,calculate the following: a.The crash cost per unit time savings for each activity. b.The maximum total crash time savings and cost. c.The maximum total time-savings with a $3000 budget. Given the critical path below,calculate the following: a.The crash cost per unit time savings for each activity. b.The maximum total crash time savings and cost. c.The maximum total time-savings with a $3000 budget.

(Essay)
4.7/5
(72)

A project organization that becomes permanent is often referred to as a:

(Multiple Choice)
4.8/5
(68)
Showing 41 - 60 of 120
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)