Project managers have their own code of ethics,established by the Project Management Institute.

(True/False)
5.0/5
(73)

A network has been crashed to the point where all activities are critical.Additional crashing:

(Multiple Choice)
4.9/5
(74)

The critical path for the network activities shown below is ________ with duration ________. The critical path for the network activities shown below is ________ with duration ________.

(Multiple Choice)
4.8/5
(96)

Which of the following statements regarding critical paths is true?

(Multiple Choice)
4.9/5
(77)

The critical path can be determined by use of either the "forward pass" or the "backward pass."

(True/False)
4.9/5
(96)

Describe the differences between a Gantt chart and a PERT/CPM network.

(Essay)
4.9/5
(76)

A project manager is interested in crashing a project with variable activity times.Which of the following tools should he/she employ?

(Multiple Choice)
4.7/5
(76)

The ________ is a project management technique using only one time factor per activity that enables managers to schedule,monitor,and control large and complex projects.

(Short Answer)
4.8/5
(73)

Given the project within the table below,calculate the following: a.The critical path b.The minimum project duration c.The amount of slack for each activity Given the project within the table below,calculate the following: a.The critical path b.The minimum project duration c.The amount of slack for each activity

(Essay)
4.8/5
(75)

PERT,but not CPM,has the ability to consider the precedence relationships in a project.

(True/False)
4.8/5
(65)

Which of the following statements regarding PERT analysis is true?

(Multiple Choice)
4.8/5
(79)

WBS stands for which of the following project management tools?

(Multiple Choice)
4.9/5
(70)

The fundamental difference between PERT and CPM is that PERT uses the beta distribution for crashing projects while CPM uses cost estimates.

(True/False)
4.8/5
(72)

Analysis of a PERT problem shows the estimated time for the critical path to be 108 days with a variance of 64.There is a .90 probability that the project will be completed before approximately day:

(Multiple Choice)
4.8/5
(68)

A code of ethics especially for project managers:

(Multiple Choice)
4.9/5
(85)

The shortest of all paths through the network is the critical path.

(True/False)
4.8/5
(80)

The expected activity time in PERT analysis is calculated as:

(Multiple Choice)
4.8/5
(84)

Activity R on a CPM network has predecessors M and N,and has successor S.R has duration 5.N's late finish is 18,while M's is 20.S's late start is 14.Which of the following is definitely true?

(Multiple Choice)
4.9/5
(69)

Slack is the amount of time an activity can be delayed without delaying the entire project.

(True/False)
4.8/5
(69)

An activity on a PERT network has these time estimates: optimistic = 1,most likely = 2,and pessimistic = 5.What is its expected activity time?

(Multiple Choice)
4.8/5
(80)