Exam 19: Scheduling
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
(True/False)
4.8/5
(90)
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
(True/False)
4.8/5
(95)
The assignment method is useful in solving scheduling problems that have which of the following characteristics?
(Multiple Choice)
4.8/5
(79)
Priority rules are the rules used to obtain a job sequence in production scheduling.
(True/False)
4.7/5
(80)
Assume you are sequencing a job using Johnson's rule.The job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?
(Multiple Choice)
4.8/5
(80)
Scheduling hourly work times using the "first hour principle" insures that no excess labor will be used during the work shift.
(True/False)
4.9/5
(83)
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule,what will be the average lateness of these orders?
(Short Answer)
4.8/5
(63)
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?
(Multiple Choice)
4.8/5
(78)
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
(True/False)
4.8/5
(77)
For a high-volume type of manufacturing which of the following is the typical production scheduling approach?
(Multiple Choice)
4.9/5
(77)
MES and SES are acronyms for "Manufacturing Environment Scheduler" and "Service Environment Scheduler" systems,respectively.
(True/False)
4.9/5
(83)
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
(True/False)
4.9/5
(76)
Which of the following is not an objective of work center scheduling?
(Multiple Choice)
4.9/5
(72)
In infinite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work,nor is the actual sequence of the work as done by each resource in the work center considered.
(True/False)
4.9/5
(79)
A machine shop has two machines,A and
B.Four jobs need to be processed through machine A first and B second.Job 1 will take one hour on machine A and three hours on machine
B.Job 2 will take three hours on A and two hours on
B.Job 3,seven on A and three on
B.Job 4,five hours on A and one hour on
B.Using Johnson's rule,in what order should these jobs be done?
(Short Answer)
4.8/5
(77)
Using the random order or "whim" priority rule to sequence production jobs means that supervisors select whichever job they feel like running first.
(True/False)
4.8/5
(76)
Which of the following might be a status and exception report used in shop-floor control?
(Multiple Choice)
4.8/5
(81)
Johnson's rule,a priority rule used in sequencing production jobs is used only in production situations where we are dealing with one machine or one stage of production activity.
(True/False)
4.8/5
(93)
Showing 21 - 40 of 69