Exam 10: Quality Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Larger samples will require wider x-bar control limits because there is more data.

(True/False)
4.9/5
(89)

If, when the coating process is in control, the long-run average is 0.09 millimeters, what metric would be used to assess this process' capability?

(Short Answer)
4.9/5
(76)

The chart below depicts 16 sample means that were taken at periodic intervals and plotted on a control chart.Does the output appear to be random?

(Essay)
4.9/5
(83)

An analyst counted 17 A/B runs and 15 U/D runs in 26 time series observations.Do these results suggest that the data are non-random?

(Essay)
4.9/5
(80)

Perform run tests on the given data.What can you conclude?

(Essay)
4.8/5
(76)

When a process is not centered, its capability is measured in a slightly different way.The symbol for this case is Cpk.

(True/False)
4.8/5
(78)

The optimum level of inspection occurs when we catch at least 98.6 percent of the defects.

(True/False)
4.8/5
(67)

Control limits are based on multiples of the process standard deviation.

(True/False)
4.8/5
(79)

A p-chart would be used to monitor _______.

(Multiple Choice)
4.9/5
(75)

The amount of inspection we choose can range from no inspection at all to inspecting each item numerous times.

(True/False)
4.7/5
(74)

An "up and down" run test uses the median as a reference point and measures the percentage above and below the median.

(True/False)
4.9/5
(86)

If the process proportion of defectives is unknown, what are the upper and lower control limits for an alpha risk of .10? .05? .01?

(Short Answer)
4.9/5
(84)

Processes that are in control eliminate variations.

(True/False)
4.8/5
(90)

What is the estimate of the process proportion of defectives for whenever it is under control?

(Multiple Choice)
4.8/5
(85)

What is the sample mean package weight for Thursday?

(Multiple Choice)
4.8/5
(75)

Given the following control chart, would you say that the process appears to be performing appropriately?

(Essay)
4.8/5
(77)

Concluding a process is out of control when it is not is known as a Type I error.

(True/False)
4.8/5
(93)

What is the standard deviation of the sampling distribution of sample means for whenever this process is under control?

(Multiple Choice)
4.8/5
(83)

The output of a process may not conform to specifications even though the process may be statistically "in control."

(True/False)
4.9/5
(66)

A process results in a few defects occurring in each unit of output.Long-run, these defects should be monitored with ___________.

(Multiple Choice)
4.8/5
(76)
Showing 121 - 140 of 141
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)