Exam 10: Quality Control
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
The process capability index (indicated by Cpk) can be used only when the process is centered.
(True/False)
4.8/5
(85)
If he uses upper and lower control limits of 22 and 18 ounces, what is his risk (alpha) of concluding this process is out of control when it is actually in control (Type I error)?
(Multiple Choice)
4.8/5
(95)
"Quality of conformance" is concerned with whether a product or service conforms to its specifications.
(True/False)
4.8/5
(85)
Assuming that the process mean of 0.09 cannot be changed, what process standard deviation would be required for this process to be considered capable (assuming that a capable process must have a capability index of at least 1.3)?
(Essay)
4.9/5
(78)
Studies on a machine that molds plastic water pipe indicate that when it is injecting 1-inch diameter pipe, the process standard deviation is 0.05 inches.The one-inch pipe has a specification of 1-inch plus or minus 0.10 inch.What is the process capability index (Cpk) if the long-run process mean is 1 inch?
(Multiple Choice)
4.9/5
(87)
What is the estimate of the standard deviation of the sampling distribution for an instructor's sample proportion of failures?
(Multiple Choice)
4.8/5
(86)
Even if the process is not centered, the process capability index (indicated by Cpk) is very useful.
(True/False)
4.8/5
(86)
A time-ordered plot of sample statistics is called a(n) ______ chart.
(Multiple Choice)
4.8/5
(87)
If the process is known to have a mean of 15 and a standard deviation of 3, using three sigma control limits, do any of the sample means indicate an out-of-control process mean?
(Short Answer)
4.9/5
(80)
If the process is known to produce 11 percent defectives on average, using three sigma control limits, do any of the sample proportions indicate an out-of-control process proportion of defectives?
(Short Answer)
4.9/5
(71)
If the process proportion of defectives is unknown, what is the alpha risk (probability of Type I error) for upper and lower control limits of .115 and .085 respectively? .13 and .07? .145 and .055?
(Short Answer)
4.9/5
(88)
Approximately 99.7% of sample means will fall within two standard deviations of the process mean if the process is under control.
(True/False)
4.9/5
(72)
If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control?
(Multiple Choice)
4.9/5
(89)
Suppose the criterion for evaluating this process is that the appropriate capability index must be at least 1.3.With a long-run process mean of 0.09 and a standard deviation of 0.015, is this process capable?
(Short Answer)
4.9/5
(72)
Variation in a sample statistic collected from a process may be either random variation or assignable variation - or both.
(True/False)
5.0/5
(85)
If he uses upper and lower control limits of 22 and 18 ounces, on what day(s), if any, does this process appear to be out of control?
(Multiple Choice)
4.9/5
(81)
Which of the following is not a step in the quality control process?
(Multiple Choice)
4.9/5
(69)
Studies on a bottle-filling machine indicates it fills bottles to a mean of 16 ounces with a standard deviation of 0.10 ounces.What is the process specification, assuming the Cpk index of 1?
(Multiple Choice)
4.8/5
(79)
Low-cost, high-volume items often require more intensive inspection.
(True/False)
4.9/5
(86)
Showing 21 - 40 of 141
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)