Exam 10: Quality Control
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
Four samples of three observations each have been taken, with actual measurements (in centimeters) shown below.Construct three-sigma mean and range charts.
(Essay)
4.8/5
(76)
Suppose the long-run average of this coating process is 0.09 millimeters.Further suppose this process' standard deviation is 0.015 millimeters.What proportion of the output from this process will fail to meet specifications?
(Short Answer)
5.0/5
(78)
A c-chart is used to monitor the number of defects per unit for process output.
(True/False)
4.8/5
(82)
What are the .95 (5% risk of Type I error) upper and lower control limits for the p-chart?
(Multiple Choice)
4.8/5
(83)
The range chart (R-chart) is most likely to detect a change in:
(Multiple Choice)
4.9/5
(79)
If the process is known to produce 11 percent defectives on average, what is the alpha risk (probability of Type I error) for upper and lower control limits of .1256 and .0944 respectively? .1412 and .0788? .1568 and .0632?
(Short Answer)
4.9/5
(83)
The process capability index (Cpk) may mislead if: (I) the process is not stable.
(II) the process output is not normally distributed.
(III) the process is not centered.
(Multiple Choice)
4.8/5
(72)
What is the estimate of the mean proportion of failures for these instructors?
(Multiple Choice)
4.9/5
(78)
A process that exhibits random variability would be judged to be out of control.
(True/False)
4.9/5
(77)
If the process is known to have a mean of 15 and a standard deviation of 3, what is the alpha risk (probability of Type I error) for upper and lower control limits of 16.5 and 13.5 respectively? 18 and 12? 19.5 and 10.5?
(Short Answer)
4.7/5
(75)
The specifications for a product are 6 mm 0.1 mm.The process is known to operate at a mean of 6.05 with a standard deviation of 0.01 mm.What is the Cpk for this process?
(Multiple Choice)
4.9/5
(89)
The purpose of statistical process control is to ensure that historical output is random.
(True/False)
5.0/5
(72)
An R value of zero (on a range chart) means that the process must be in control since all sample values are equal.
(True/False)
4.8/5
(78)
Quality control is assuring that processes are performing in an acceptable manner.
(True/False)
4.8/5
(86)
Type I and Type II errors refer to the magnitude of variation from the standard.
(True/False)
4.9/5
(84)
Showing 101 - 120 of 141
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)