Exam 10: Quality Control
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
What is the standard deviation of the sampling distribution of sample means for whenever service life is in control?
(Multiple Choice)
4.9/5
(63)
What are the control chart upper and lower control limits for an alpha risk of .05?
(Multiple Choice)
5.0/5
(74)
"Assignable variation" is variation due to a specific cause, such as tool wear.
(True/False)
4.8/5
(79)
If a process is performing as it should, it is still possible to obtain observations which are outside of which limits? (I) tolerances
(II) control limits
(III) process variability
(Multiple Choice)
4.8/5
(79)
The probability of concluding that assignable variation exists when only random variation is present is: (I) the probability of a Type I error
(II) known as the alpha risk
(III) highly unlikely
(IV) the sum of probabilities in the two tails of the normal distribution
(Multiple Choice)
4.8/5
(70)
_______ variation is a variation whose cause can be identified.
(Multiple Choice)
5.0/5
(79)
If he uses upper and lower control limits of 520 and 480 hours, what is his risk (alpha) of concluding service life is out of control when it is actually under control (Type I error)?
(Multiple Choice)
4.9/5
(79)
Patterns of data on a control chart suggest that the process may have non-random variation.
(True/False)
4.9/5
(93)
The larger the process variation, the tighter the specifications should be.
(True/False)
4.9/5
(80)
A c-chart is used to monitor the total number of defectives in the output of a process.
(True/False)
4.8/5
(79)
The optimum level of inspection minimizes the sum of inspection costs and the cost of passing defectives.
(True/False)
4.8/5
(83)
Range control charts are used to monitor process central tendency.
(True/False)
4.9/5
(82)
A process that makes chocolate candy bars has an output that is normally distributed with a mean of 6 oz.and a standard deviation of .01 oz.A job is to be run that requires 200 candy bars.
Determine three sigma control limits for an x-bar chart assuming a sample size of 10.
If specifications are 5.98 to 6.02, what run size should be used for this job so that the expected number of good candy bars is 200, assuming the process is in control?
(Short Answer)
4.8/5
(90)
The number of defective parts in a sample is an example of variable data because it will "vary" from one sample to another.
(True/False)
4.7/5
(81)
The variation of a sampling distribution is tighter than the variation of the underlying process distribution.
(True/False)
4.8/5
(78)
Organizations should work to improve process capability so that quality control efforts can become more ________.
(Multiple Choice)
4.8/5
(82)
The sampling distribution can be assumed to be approximately normal even when the underlying process distribution is not normally distributed.
(True/False)
4.9/5
(67)
What is the estimate of the process mean for whenever it is under control?
(Multiple Choice)
5.0/5
(82)
When a process is in control, it results in there being, on average, 16 defects per unit of output.C-chart limits of 4 and 28 would lead to a _______ chance of a Type I error.
(Multiple Choice)
4.8/5
(70)
Showing 81 - 100 of 141
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)