Exam 10: Quality Control
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
If the process is known to have a mean of 15 and a standard deviation of 3, what are the three sigma upper and lower control limits for an x-bar chart?
(Short Answer)
4.9/5
(77)
Statistical process control focuses on the acceptability of process output.
(True/False)
4.9/5
(86)
A point which is outside of the lower control limit on an R-chart:
(Multiple Choice)
4.7/5
(74)
A plot below the lower control limit on the range chart: (I) should be ignored since lower variation is desirable
(II) may be an indication that process variation has decreased
(III) should be investigated for assignable cause
(Multiple Choice)
4.8/5
(91)
What are the x-bar chart three sigma upper and lower control limits?
(Multiple Choice)
4.7/5
(84)
Run tests give managers an alternative to control charts; they are quicker and cost less.
(True/False)
4.8/5
(74)
If a point on a control chart falls outside one of the control limits, this suggests that the process output is non-random and should be investigated.
(True/False)
4.9/5
(88)
What is the mean of the sampling distribution of sample means when service life is in control?
(Multiple Choice)
4.7/5
(87)
Run tests are useful in helping to identify nonrandom variations in a process.
(True/False)
4.9/5
(67)
If the process is known to produce 11 percent defectives on average, what are the upper and lower control limits for an alpha risk of .10? .05? .01?
(Short Answer)
4.8/5
(80)
A time-ordered plot of representative sample statistics is called a:
(Multiple Choice)
4.9/5
(88)
The basis for a statistical process control chart is a(the) __________.
(Multiple Choice)
4.8/5
(80)
"Process capability" compares "process variability" to the "tolerances."
(True/False)
4.9/5
(83)
If the process is known to have a mean of 15 and a standard deviation of 3, what is the mean of the sampling distribution of sample means for whenever this process is under control? The standard deviation?
(Short Answer)
4.8/5
(68)
Non-random variation is likely whenever all observations are between the LCL and UCL.
(True/False)
4.7/5
(78)
For upper and lower control limits of .026 and .014, which machine(s), if any, appear(s) to be out-of-control for process proportion of defectives?
(Multiple Choice)
4.8/5
(86)
Showing 61 - 80 of 141
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)