The purpose of control charts is to:

(Multiple Choice)
4.8/5
(68)

Tolerances represent the control limits we use on the charts.

(True/False)
4.8/5
(82)

A lower control limit must by definition be a value less than an upper control limit.

(True/False)
4.9/5
(74)

A town's department of public works is concerned about adverse public reaction to a sewer project that is currently in progress.Because of this, the Commissioner of Public Works has authorized a weekly survey to be conducted of town residents.Each week, a sample of 100 residents is questioned on their feelings towards the project.The results to date are shown below.Analyze this data using control charts that would provide for a 5% risk of Type I error.

(Essay)
5.0/5
(84)

The Taguchi Cost Function suggests that the capability ratio can be improved by extending the spread between LCL and UCL.

(True/False)
4.9/5
(93)

If the process proportion of defectives is unknown, using .10 alpha risk control limits, do any of the sample proportions indicate an out-of-control process proportion of defectives?

(Short Answer)
4.8/5
(81)

An operator collected the following time series data from a process:

(Essay)
4.8/5
(75)

Statistical Process Control is the measurement of rejects in the final product.

(True/False)
4.8/5
(78)

The primary purpose of statistical process control is to detect a defective product before it is shipped to a customer.

(True/False)
4.8/5
(78)

The number of runs with respect to the sample median is:

(Multiple Choice)
4.8/5
(81)

Construct the appropriate two-sigma control chart for the sample observations listed below.

(Essay)
4.9/5
(74)

Control limits used on process control charts are specifications established by design or customers.

(True/False)
4.8/5
(76)

What is the estimate of the sample average range based upon this limited sample?

(Multiple Choice)
4.8/5
(86)

A control chart used to monitor the fraction of defectives generated by a process is the:

(Multiple Choice)
4.9/5
(72)

The amount of inspection needed is governed by the costs of inspection and the expected costs of passing defective items.

(True/False)
4.9/5
(74)

If the process proportion of defectives is unknown, what is the estimate of it?

(Short Answer)
4.8/5
(71)

What is the sample proportion of defectives for sample #1? #2? #3?

(Short Answer)
4.9/5
(88)

The number of runs with respect to the sample median is:

(Multiple Choice)
4.9/5
(71)

What is the sample mean service life for sample 2?

(Multiple Choice)
4.7/5
(84)

Range charts and p-charts are both used for variable data.

(True/False)
4.8/5
(81)