Exam 1: Operations and Productivity

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is a similarity between goods and services?

(Multiple Choice)
4.9/5
(78)

One reason to study operations management is to learn how people organize themselves for productive enterprise.

(True/False)
4.9/5
(83)

Productivity can be improved by

(Multiple Choice)
4.7/5
(83)

A knowledge society is one that has migrated from work based on knowledge to one based on manual work.

(True/False)
4.8/5
(74)

An example of a "hidden" production function is money transfers at banks.

(True/False)
4.9/5
(69)

Gibson Valves produces cast bronze valves on an assembly line. If 1600 valves are produced in an 8-hour shift, the productivity of the line is

(Multiple Choice)
4.8/5
(83)

A swimming pool company has 100,000 labor hours available per summer and with a labor productivity of 5 pools per 6,000 hours. a. How many pools can the company install this summer? b. Suppose the multifactor productivity was one pool per $25,000. How much should the company expect to spend this summer constructing the pools?

(Essay)
4.7/5
(76)

Measuring the impact of a capital acquisition on productivity is an example of multifactor productivity.

(True/False)
4.8/5
(79)

Marketing, Production, and __________ are the three functions that all organizations must perform to create goods and services.

(Short Answer)
4.9/5
(99)

A grocery chain is considering the installation of a set of 4 self-checkout lanes. The new self-checkout lane setup will replace 2 old cashier lanes that were staffed by a cashier and bagger on each lane. One cashier mans all 4 self-checkouts (answering questions, checking for un-scanned items, taking coupons, etc). Checkout on the new lanes takes 2 minutes (customers bag their own orders) while checkout with the old lanes took only 45 seconds. In addition the electricity costs for both setups are $.05 per checkout while bagging (material) costs are $.1 per checkout with the old system and $.15 for the new system. The new lanes also require $100 in capital costs. Assume that the lanes are always in use for 8 hours per day (1 shift) and that a worker makes $10/hour. a. How many checkouts did the old system provide in a shift? b. How many checkouts does the new system provide? c. What is the multifactor productivity for each system?

(Essay)
4.9/5
(73)

The "Father of Scientific Management" is

(Multiple Choice)
4.8/5
(98)

A foundry produces circular utility access hatches (manhole covers). If 120 covers are produced in a 10-hour shift, the productivity of the line is

(Multiple Choice)
4.9/5
(80)

In order to have a career in operations management, one must have a degree in statistics or quantitative methods.

(True/False)
4.9/5
(87)

Reasons to study Operations Management include

(Multiple Choice)
4.8/5
(71)

The Dulac Box plant produces wooden packing boxes to be used in the local seafood industry. Current operations allow the company to make 500 boxes per day, in two 8-hour shifts (250 boxes per shift). The company has introduced some moderate changes in equipment, and conducted appropriate job training, so that production levels have risen to 300 boxes per shift. Labor costs average $10 per hour for each of the 5 full-time workers on each shift. Capital costs were previously $3,000 per day, and rose to $3,200 per day with the equipment modifications. Energy costs were unchanged by the modifications, at $400 per day. What is the firm's multifactor productivity before and after the changes?

(Essay)
4.8/5
(72)

The person most responsible for popularizing interchangeable parts in manufacturing was

(Multiple Choice)
4.9/5
(74)

Which of the following nets the largest productivity improvement?

(Multiple Choice)
4.7/5
(70)

Shewhart's contributions to operations management came during the Scientific Management Era.

(True/False)
4.8/5
(73)

A local university is considering changes to its class structure in an effort to increase professor productivity. The old schedule had each professor teaching 5 classes per week, with each class meeting an hour per day on Monday, Wednesday, and Friday. Each class contained 20 students. The new schedule has each professor teaching only 3 classes, but each class meets daily for an hour. New classes contain 50 students. a. Calculate the labor productivity for the initial situation (students/hour). b. Calculate the labor productivity for the schedule change (students/hour). c. Are there any ethical considerations that should be accounted for? d. Suppose that each teacher also is required to have 2 hours of Office Hours each day he/she taught class. Is the schedule change a productivity increase?

(Essay)
4.9/5
(83)

Operations management is applicable

(Multiple Choice)
4.9/5
(83)
Showing 101 - 120 of 126
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)