Exam 2: Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Project close out consists of a)completing the remaining deliverables and b)paying the final bills.

(True/False)
4.8/5
(82)

The earliest start time for an activity is equal to the:

(Multiple Choice)
4.7/5
(81)

The network diagram is a planning method that is designed to depict the relationships between activities.

(True/False)
4.8/5
(73)

Projects,and the application of project management,facilitate the implementation of operations strategy.

(True/False)
4.9/5
(76)

Information accuracy relative to the completeness of the work breakdown structure and communication of timely information affect the:

(Multiple Choice)
4.9/5
(77)

Fig.2.1 Fig.2.1   -For the network shown in Fig.2.1,which of the following is the critical path? -For the network shown in Fig.2.1,which of the following is the critical path?

(Multiple Choice)
4.9/5
(77)

The probability that a project will be completed by its earliest expected completion date is:

(Multiple Choice)
4.8/5
(75)

Following are four sets of most optimistic,most likely,and most pessimistic times (in weeks)for an activity.Which one of the four sets will have a mean estimated time equal to the most likely time?

(Multiple Choice)
5.0/5
(84)

Table 2.4 Table 2.4    -Using Table 2.4,what is the minimum number of activities that would have to be delayed to cause an increase in the project's earliest completion date? -Using Table 2.4,what is the minimum number of activities that would have to be delayed to cause an increase in the project's earliest completion date?

(Multiple Choice)
4.9/5
(74)

________ is an attempt to reduce the peaks and valleys in resource needs by shifting the schedules of conflicting activities within their earliest and latest start dates.

(Essay)
4.9/5
(84)

The ________ is determined by starting with the normal time schedule and crashing activities along the critical path in such a way that the costs of crashing do not exceed the savings in indirect and penalty costs.

(Essay)
4.8/5
(73)

A plan that identifies key threats to a project and prescribes ways to circumvent them is called a:

(Multiple Choice)
4.8/5
(78)

What are the primary responsibilities of a Project Manager? Briefly describe these responsibilities for a project manager whose team is purchasing a new machine and installing it in a manufacturing process.

(Essay)
4.8/5
(66)

In a network diagram,an activity:

(Multiple Choice)
4.8/5
(75)

Table 2.6 Table 2.6    -Using Table 2.6,every day the construction crew is on-site costs $1000.What activities would you consider crashing to reduce the project completion cost? -Using Table 2.6,every day the construction crew is on-site costs $1000.What activities would you consider crashing to reduce the project completion cost?

(Multiple Choice)
4.9/5
(87)

Table 2.12 Table 2.12   -Using Table 2.12,if the project completion time has to be reduced by one week,which of the following activities should be crashed to minimize the extra cost of earlier completion? -Using Table 2.12,if the project completion time has to be reduced by one week,which of the following activities should be crashed to minimize the extra cost of earlier completion?

(Multiple Choice)
4.9/5
(93)

Table 2.4 Table 2.4    -Using Table 2.4,what is the slack associated with activity B? -Using Table 2.4,what is the slack associated with activity B?

(Multiple Choice)
4.8/5
(71)

Why is identifying which path is the critical path important in a project management?

(Essay)
5.0/5
(93)

Table 2.10 Table 2.10    -Using Table 2.10,what is the earliest possible completion time for activity E after crashing? -Using Table 2.10,what is the earliest possible completion time for activity E after crashing?

(Multiple Choice)
4.7/5
(78)

Activity times for a project are estimated by all but which of the following methods?

(Multiple Choice)
4.7/5
(74)
Showing 121 - 140 of 151
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)