Exam 23: Lean Systems
Exam 1: Introduction to Operations and Supply Chain Management79 Questions
Exam 2: Supplement Operational Decision-Making Tools: Decision Analysis43 Questions
Exam 3: Quality Management91 Questions
Exam 4: Statistical Process Control103 Questions
Exam 5: Supplement Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 6: Product Design86 Questions
Exam 7: Service Design77 Questions
Exam 8: Processes and Technology47 Questions
Exam 9: Capacity and Facilities90 Questions
Exam 10: Supplement Operational Decision-Making Tools: Facility Location Models22 Questions
Exam 11: Human Resources90 Questions
Exam 12: Supplement Operational Decision-Making Tools: Work Measurement26 Questions
Exam 13: Project Management98 Questions
Exam 14: Supply Chain Management Strategy and Design73 Questions
Exam 15: Global Supply Chain Procurement and Distribution86 Questions
Exam 16: Supplement Operational Decision-Making Tools: Transportation and Transshipment Models28 Questions
Exam 17: Forecasting94 Questions
Exam 18: Inventory Management93 Questions
Exam 19: Supplement Operational Decision-Making Tools: Simulation25 Questions
Exam 20: Sales and Operations Planning85 Questions
Exam 21: Supplement Operational Decision-Making Tools: Linear Programming38 Questions
Exam 22: Enterprise Resource Planning92 Questions
Exam 23: Lean Systems86 Questions
Exam 24: Scheduling99 Questions
Select questions type
Lean can have serious deficiencies when applied to companies that have
(Multiple Choice)
4.8/5
(80)
All of the following are benefits expected from implementing lean production except
(Multiple Choice)
4.9/5
(88)
A workstation's output is 200 bottles of wine per hour.It takes 30 minutes to receive a withdrawal kanban of corks from the previous workstation.The withdrawal kanban is attached to a container holding 30 corks.The process uses a safety factor of 20 percent.What is the number of withdrawal kanbans needed to support the bottling process?
(Multiple Choice)
4.8/5
(93)
Poka-yolk is a Japanese term used to describe the removal of waste in a lean production system.
(True/False)
4.8/5
(76)
Which of the following is not typically a component of lead time?
(Multiple Choice)
4.8/5
(99)
The concept of cellular layouts was developed by a U.S.engineer in the 1920s.
(True/False)
4.7/5
(91)
A ____________ kanban is used to order material in advance of production.
(Multiple Choice)
4.8/5
(93)
Early adopters of lean production in the U.S.were unsuccessful because they tried to implement lean by slashing inventories by forcing their suppliers to make more frequent deliveries.
(True/False)
4.8/5
(83)
The number of kanbans needed to maintain control in a pull system can be calculated from demand and lead time information.
(True/False)
4.8/5
(82)
Analyzing process flow and eliminating waste is referred to as
(Multiple Choice)
4.7/5
(77)
Push systems rely on predetermined production schedules often generated by computerized systems.
(True/False)
4.9/5
(75)
Which of the following statements concerning small-lot production is not true?
(Multiple Choice)
4.9/5
(74)
Improved scheduling of materials,workers,and machines will most generally affect
(Multiple Choice)
4.8/5
(87)
Mass production means doing more with fewer workers,less inventory,and less space.
(True/False)
4.9/5
(79)
General purpose machines are an example of flexible resources in lean production.
(True/False)
4.7/5
(86)
Flexible resources is one of the basic elements of lean production.
(True/False)
4.8/5
(82)
Reducing variability in production through more accurate demand forecasts is one way to create more uniform production levels.
(True/False)
4.8/5
(77)
Showing 41 - 60 of 86
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)