Exam 23: Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The concept of allocating extra time to a schedule for planning,problem solving,and maintenance is known as

Free
(Multiple Choice)
4.9/5
(82)
Correct Answer:
Verified

D

A workstation must produce 400 units an hour.It takes 24 minutes to receive the necessary material for production from the previous workstation.Output is moved between workstations in containers holding 44 units.If the process uses a safety factor of 10%,then the number of kanbans that should be circulating between this workstation and the previous workstation is

Free
(Multiple Choice)
4.9/5
(91)
Correct Answer:
Verified

B

The authority given to the worker to stop the production line if quality problems are encountered is known as

Free
(Multiple Choice)
4.8/5
(86)
Correct Answer:
Verified

B

Advantages of small-lot production include requiring less space and lower capital investment.

(True/False)
4.7/5
(77)

A kanban square is a marked area designated for holding a set quantity of output.

(True/False)
4.9/5
(78)

What is a kanban and how is it used in a pull system?

(Essay)
4.8/5
(73)

______________ setups can be performed in advance while the machine is running.

(Multiple Choice)
4.7/5
(86)

The benefits of lean production include all of the following except reduced

(Multiple Choice)
4.8/5
(88)

Successful companies use lean to

(Multiple Choice)
4.7/5
(78)

In lean production,waste is defined as anything that does not add value to the product.

(True/False)
4.8/5
(71)

A poka-yoke is any foolproof device that prevents defects or injury from occurring.

(True/False)
4.9/5
(82)

The pull system was developed by Ohno to coordinate production between processes.

(True/False)
5.0/5
(75)

Internal setup activities can be performed when a process is running.

(True/False)
4.8/5
(71)

A ___________ is a foolproof device that prevents defects from occurring.

(Multiple Choice)
4.9/5
(85)

What is a manufacturing cell and what is its purpose?

(Essay)
4.7/5
(76)

Mixed-modeling sequencing is used at Toyota to create uniform production levels.

(True/False)
4.7/5
(72)

In lean production,a strong relationship exists between setup times and lot size.

(True/False)
4.9/5
(74)

Leaning a supply chain ____________ flow through a series of suppliers.

(Multiple Choice)
4.9/5
(83)

American workers implementing lean prefer

(Multiple Choice)
4.9/5
(80)

Which of the following is not a basic element of lean production?

(Multiple Choice)
4.9/5
(67)
Showing 1 - 20 of 86
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)