Exam 9: Capacity and Facilities
Exam 1: Introduction to Operations and Supply Chain Management79 Questions
Exam 2: Supplement Operational Decision-Making Tools: Decision Analysis43 Questions
Exam 3: Quality Management91 Questions
Exam 4: Statistical Process Control103 Questions
Exam 5: Supplement Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 6: Product Design86 Questions
Exam 7: Service Design77 Questions
Exam 8: Processes and Technology47 Questions
Exam 9: Capacity and Facilities90 Questions
Exam 10: Supplement Operational Decision-Making Tools: Facility Location Models22 Questions
Exam 11: Human Resources90 Questions
Exam 12: Supplement Operational Decision-Making Tools: Work Measurement26 Questions
Exam 13: Project Management98 Questions
Exam 14: Supply Chain Management Strategy and Design73 Questions
Exam 15: Global Supply Chain Procurement and Distribution86 Questions
Exam 16: Supplement Operational Decision-Making Tools: Transportation and Transshipment Models28 Questions
Exam 17: Forecasting94 Questions
Exam 18: Inventory Management93 Questions
Exam 19: Supplement Operational Decision-Making Tools: Simulation25 Questions
Exam 20: Sales and Operations Planning85 Questions
Exam 21: Supplement Operational Decision-Making Tools: Linear Programming38 Questions
Exam 22: Enterprise Resource Planning92 Questions
Exam 23: Lean Systems86 Questions
Exam 24: Scheduling99 Questions
Select questions type
Which one of the following factors is not important to the design and operation of a mixed-model assembly line?
Free
(Multiple Choice)
4.9/5
(71)
Correct Answer:
D
Line balancing is constrained by precedence requirements and cycle time restrictions.
Free
(True/False)
4.8/5
(86)
Correct Answer:
True
The efficiency of a flexible manufacturing system (FMS)comes from reductions in setup and waiting times.
Free
(True/False)
4.8/5
(90)
Correct Answer:
True
Which of the following is not an objective of facility layout?
(Multiple Choice)
4.7/5
(74)
Which one of the following is not an example of a basic facility layout?
(Multiple Choice)
4.7/5
(84)
Block diagramming is a design tool for process layouts that takes into account the number of adjacent and non-adjacent moves.
(True/False)
4.8/5
(75)
The major layout concern for a process layout is where to locate departments or functional areas relative to each other.
(True/False)
4.8/5
(79)
An assembly line consists of three workstations (WS)with each station's activity time as shown.
When fully operational this line could assemble _______ completed items every 60 minutes.
(Multiple Choice)
4.9/5
(84)
Line balancing is a procedure that requires cycle time to be the same as flow time.
(True/False)
4.8/5
(78)
Product layouts have a higher degree of flexibility than process layouts.
(True/False)
4.8/5
(82)
Briefly describe facility layout and the different objectives involved with facility layout decision.
(Essay)
4.9/5
(69)
Which of the following is not an advantage of cellular layouts?
(Multiple Choice)
4.9/5
(78)
The major advantage of a process layout over a product layout is efficiency.
(True/False)
4.9/5
(80)
An assembly line consists of three workstations (WS)with each station's activity time as shown.
The cycle time for this line is
(Multiple Choice)
4.8/5
(84)
An assembly line consists of three workstations (WS)with each station's activity time as shown.
When fully operational the maximum output for this line in 8 hours of production time would be
(Multiple Choice)
5.0/5
(83)
A ________layout encourages customer familiarity,has low costs,and is easy to clean.
(Multiple Choice)
4.8/5
(71)
An assembly line consists of three workstations (WS)with each station's activity time as shown.
The flow time for items on this line would be
(Multiple Choice)
4.8/5
(73)
A mixed-model assembly line processes each model in large batch sizes.
(True/False)
4.9/5
(80)