Exam 9: Capacity and Facilities

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A process layout groups similar activities together according to the functions they perform.

(True/False)
5.0/5
(80)

With line balancing the maximum amount of time the product is allowed to spend at each workstation is known as the

(Multiple Choice)
4.8/5
(84)

The desired cycle time refers to the maximum amount of time a product is allowed to spend at each workstation.

(True/False)
4.9/5
(84)

Which of the following is not a capacity expansion strategy?

(Multiple Choice)
4.8/5
(83)

If the line currently assembles 10 units every hour when fully functional,then the line's balance delay at this rate of output is If the line currently assembles 10 units every hour when fully functional,then the line's balance delay at this rate of output is

(Multiple Choice)
4.9/5
(86)

The line balancing procedure uses heuristics to specify which work elements are allocated to each workstation.

(True/False)
4.8/5
(85)

Line balancing strives to minimize bottlenecks in a process layout.

(True/False)
4.7/5
(70)

Material storage and movement are directly affected by facility layout decisions.

(True/False)
4.8/5
(86)

The ______________________ is the percent of demand held in reserve for unexpected occurrences.

(Multiple Choice)
4.9/5
(79)

A company produces shovels in five departments.The average number of loads transported between the five departments per month is given in the load summary chart. (Insert 2 x 3 grid - see page 268) Load Summary Chart From/to Department Department 1 2 3 4 5 1 - - 30 - - 2 - - 30 25 - 3 30 - - - 20 4 - 40 - - 20 5 - 30 - - - Determine the number nonadjacent loads.

(Multiple Choice)
4.8/5
(67)

Capacity is defined as the

(Multiple Choice)
4.8/5
(86)

Cellular layouts combine the flexibility of process layouts with the efficiency of product layouts.

(True/False)
4.8/5
(81)

A company produces shovels in five departments.The average number of loads transported between the five departments per month is given in the load summary chart. (Insert 2 x 3 grid - see page 268) Load Summary Chart From/to Department Department 1 2 3 4 5 1 - 10 - - - 2 - - 30 25 - 3 30 - - - - 4 - 40 - - 20 5 - 15 - - - Determine the number nonadjacent loads.

(Multiple Choice)
4.7/5
(83)

A company has a target output rate of 40 units every five hours when its line is fully operational.To achieve this target the firm must have a desired cycle time of

(Multiple Choice)
4.9/5
(83)

Minimizing material handling cost is an important objective for a process layout.

(True/False)
4.9/5
(77)

The capacity cushion for a facility equals one minus utilization.

(True/False)
4.7/5
(71)

Shipbuilding is an example of production system requiring a process layout.

(True/False)
4.9/5
(82)

A schematic diagram that uses weighted lines to denote location preference is known as a

(Multiple Choice)
4.9/5
(84)

In a product layout,the process of assigning tasks to work stations is referred to as _________ balancing.

(Multiple Choice)
4.8/5
(82)

A flexible manufacturing system (FMS)combines flexibility with higher efficiency.

(True/False)
4.8/5
(74)