Exam 8: Activity-Based Costing
Exam 1: Introduction to Management Accounting78 Questions
Exam 2: An Introduction to Cost Terms and Concepts79 Questions
Exam 3: Cost-Volume-Profit Analysis121 Questions
Exam 4: Measuring Relevant Costs and Revenues for Decision-Making82 Questions
Exam 5: Pricing Decisions and Profitability Analysis62 Questions
Exam 6: Capital Investment Decisions110 Questions
Exam 7: Cost Assignment81 Questions
Exam 8: Activity-Based Costing108 Questions
Exam 9: The Budgeting Process120 Questions
Exam 10: Management Control Systems83 Questions
Exam 11: Standard Costing and Variance Analysis95 Questions
Exam 12: Divisional Financial Performance Measurement86 Questions
Exam 13: Transfer Pricing in Divisionalized Companies63 Questions
Exam 14: Cost Management156 Questions
Exam 15: Strategic Performance Management49 Questions
Select questions type
Compare and contrast traditional organization-based costing with activity-based costing.
(Essay)
5.0/5
(89)
The activity-based resource usage model improves managerial control and decision making such as
(Multiple Choice)
4.9/5
(83)
Figure 3
The Overdale plant has two categories of overhead: maintenance and inspection. Costs expected for these categories for the coming year are as follows:
The plant currently applies overhead using direct labour hours and expected capacity of 80,000 direct labour hours. The following data has been assembled for use in developing a bid for a proposed job:
Total expected machine hours for all jobs during the year are 40,000, and the total expected number of inspections is 2,500.
-Refer to Figure 3 above. Using activity-based costing and the appropriate cost drivers, the total cost of the potential job would be
(Multiple Choice)
4.9/5
(79)
Figure 1 A company usually processes 20,000 orders at a total cost of £300,000. During the year, only 16,000 orders were processed.
Refer to Figure 1. What is the cost of unused activity?
(Multiple Choice)
4.8/5
(87)
Briefly discuss the problem with the unit-level approach to cost estimation and discuss some of the errors that may occur.
(Essay)
4.8/5
(77)
Ernest, SA., has identified the following overhead costs and cost drivers for next year:
The following are two of the jobs completed during the year:
The company's normal activity is 32,000 direct labour hours. (Round amounts to two decimal places.)
Required:
a.
Determine the unit cost for each job using direct labour hours to apply overhead.
b.
Determine the unit cost for each job using the four cost drivers.
c.
Which method produces the more accurate cost assignment? Why?
(Essay)
4.9/5
(89)
What is the initial step in implementing an activity-based costing system?
(Multiple Choice)
4.7/5
(81)
Zipp Company manufactures two products (X and Y). The overhead costs (£84,000) have been divided into three cost pools that use the following activity cost drivers: What is the allocation rate per packing order using activity-based costing?

(Multiple Choice)
4.8/5
(76)
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
What is(are) the facility-level activity(ies)?

(Multiple Choice)
4.8/5
(70)
Spear Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are as follows: Currently, overhead is applied using a predetermined overhead rate based upon budgeted direct labour hours. 20,000 direct labour hours are budgeted for next year.
The company has been asked to submit a bid for a proposed job. The plant manager feels that obtaining this job would result in new business in future years. Usually bids are based upon full manufacturing cost plus 15 percent. Estimates for the proposed job are as follows:
In the past, full manufacturing cost has been calculated by allocating overhead using a volume-based activity driver, direct labour hours. The plant manager has heard of a new way of applying overhead that uses cost pools and activity drivers. Expected activity for the four activity drivers that would be used are:
If material moves are used to assign material handling costs, the amount of material handling costs allocated to the proposed job would be

(Multiple Choice)
4.8/5
(81)
If activity-based costing is used, insurance on the plant would be classified as a
(Multiple Choice)
4.9/5
(76)
Resources that are only purchased precisely at the time the resource is needed are called
(Multiple Choice)
4.9/5
(72)
The use of unit-based activity drivers to assign costs tends to
(Multiple Choice)
5.0/5
(66)
Hill Manufacturing uses an activity-based costing system. The company produces Model A and Model B. Information concerning the two products is as follows:
Required:

(Essay)
5.0/5
(86)
An activity-based costing system uses which of the following procedures?
(Multiple Choice)
4.8/5
(84)
The activity-based approach to break-even costing emphasizes
(Multiple Choice)
4.8/5
(68)
All of the following are nonunit-based activity drivers EXCEPT
(Multiple Choice)
4.8/5
(78)