Exam 10: Extension: Acceptance Sampling
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
The quality manager for Frozen Pizzas, Inc., is concerned about the quality of the lot of several thousand pizzas which his company produced this week, and is now ready to ship. If he uses an acceptance sampling plan of n = 8 and c = 1, what will be the average outgoing quality for lots with 10 percent defectives?
(Multiple Choice)
4.8/5
(77)
Shipments of bowling balls are sampled before delivery to a warehouse. Lots of 600 balls are checked, using 10 observations from each lot. Any lot with more than one defective is rejected. Calculate values for the operating characteristic curve for this sampling plan.
(Essay)
4.8/5
(89)
The quality manager for Frozen Pizzas, Inc., is concerned about the quality of the lot of several thousand pizzas which his company produced this week, and is now ready to ship. If he uses an acceptance sampling plan of n = 8 and c = 1, what is the probability that, if this lot is 15 percent defective, it will be rejected and completely inspected prior to shipment?
(Multiple Choice)
4.9/5
(83)
The quality manager for Frozen Pizzas, Inc., is concerned about the quality of the lot of several thousand pizzas which his company produced this week, and is now ready to ship. If he uses an acceptance sampling plan of n = 8 and c = 1, what is the probability that, if this lot is 10 percent defective, it will be accepted for shipment without inspection?
(Multiple Choice)
4.9/5
(87)
The quality manager for Microelectronics, Inc., is concerned about the quality of the batch of several thousand Z-box games which his company is about to ship. If he uses an acceptance sampling plan of n = 20 and c = 1, what will be the average outgoing quality for batches with 15 percent defectives?
(Multiple Choice)
4.8/5
(73)
The ability of an acceptance sampling plan to discriminate between good and bad lots is described by its operating characteristic curve.
(True/False)
4.8/5
(82)
Which one of the following would not be a reason for using acceptance sampling?
(Multiple Choice)
4.8/5
(82)
Acceptance sampling is most useful when the cost consequences of passing defectives are low.
(True/False)
4.9/5
(84)
Suppose we have a lot of several thousand units of a finished good. If n = 20 and c = 2, what is the probability that, if this lot were 5 percent defective, it would be rejected and completely inspected prior to shipment? 10 percent defective? 15 percent? 20 percent?
(Short Answer)
4.9/5
(84)
The quality manager for Graphics, Inc., is concerned about the quality of the lot of several thousand posters which her company printed this week and is now preparing to ship. If the cost of replacing a defective poster once it has been shipped is $10.00, while the cost of complete 100 percent inspection prior to shipment is $.50 per poster, at what point is she indifferent between complete inspection and shipment without inspection?
(Multiple Choice)
4.9/5
(74)
A graphical representation that shows the risk of: (1) accepting bad lots and (2) rejecting good lots is called the:
(Multiple Choice)
4.7/5
(82)
In a double-sampling plan, a second sample is taken if the results of the first sample are inconclusive.
(True/False)
4.8/5
(76)
Suppose a batch is of unacceptable quality. There is a 10 percent chance that it will be accepted. Thus, ________ is 10 percent.
(Short Answer)
4.8/5
(88)
In a double-sampling plan, a second sample may not be taken if the results of the first sample are conclusive.
(True/False)
4.9/5
(72)
Suppose that only two incoming fraction defective levels, 2 percent and 6 percent, are possible. The 2 percent incoming fraction defective level is twice as likely as the 6 percent. At a 2 percent incoming fraction defective, there's an 80 percent chance that a lot will be accepted. At 6 percent incoming fraction defective, there's a 20 percent chance that a lot will be accepted. Lots that are not accepted are subject to 100 percent sorting. What is average outgoing quality (approximately)?
(Multiple Choice)
4.9/5
(86)
The ability of a sampling plan to discriminate between lots of high quality and lots of low quality is described by:
(Multiple Choice)
4.8/5
(62)
Showing 41 - 60 of 65
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)