Exam 17: Material Requirements Planning MRP and ERP
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management123 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 7: Statistical Process Control154 Questions
Exam 8: Process Strategy131 Questions
Exam9: Capacity and Constraint Management107 Questions
Exam 10: Location Strategies140 Questions
Exam 11: Layout Strategies161 Questions
Exam 12: Human Resources, Job Design, and Work Measurement191 Questions
Exam 13: Supply-Chain Management145 Questions
Exam 14: Outsourcing as a Supply-Chain Strategy73 Questions
Exam 15: Inventory Management155 Questions
Exam 16: Aggregate Planning134 Questions
Exam 17: Material Requirements Planning MRP and ERP169 Questions
Exam 18: Short-Term Scheduling139 Questions
Exam 19: Just-In-Time and Lean Options137 Questions
Exam 20: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation93 Questions
Select questions type
A bill of material lists all components, ingredients, and materials needed to produce one unit of an end item.
(True/False)
4.8/5
(81)
Which of the following best differentiates material requirements planning (MRP) from finite capacity scheduling (FCS)?
(Multiple Choice)
4.9/5
(82)
Each R requires 4 of component S; each S requires 3 of part T. The lead time for assembly of R is 1 week. The lead time for the manufacture of S is 2 weeks. The lead time for the procurement of T is 6 weeks. The cumulative lead time for R is __________ weeks.
(Multiple Choice)
4.9/5
(86)
What is the "supermarket" as it is used in MRP?
How does it alter the responsibility for dealing with lead-time offsets?
(Essay)
4.9/5
(78)
The following table is an example of a(n) Week 1 Week 2 Week 3 Week 4 Week 5 Clothes Washer 200 100 Clothes Dryer 300 100 100 100 Upright Freezer 200 500
(Multiple Choice)
4.8/5
(72)
The master production schedule is a forecast of demand for families of products.
(True/False)
4.8/5
(74)
Jacquie Welkener, operations manager for ABC Technologies, must schedule work for the next five days. Each unit takes 30 minutes to process. Available capacity is 8 hours per day. The production order quantities are 12, 18, 20, 13, and 17 for Monday through Friday, respectively. What should be the production plan?
(Essay)
4.7/5
(76)
An item's holding cost is 60 cents per week. Each setup costs $120. Lead time is 2 weeks. EPP is
(Multiple Choice)
4.9/5
(84)
A firm makes numerous models of mowers, garden tractors, and gasoline powered utility vehicles. Some assemblies and parts are common to many end items. To relieve the MPS of performing order releases on these common parts, the firm might choose to use the __________ technique.
(Multiple Choice)
4.8/5
(81)
A dependent demand item is so called because its demand is dependent on customer preferences.
(True/False)
4.9/5
(85)
A(n) __________ is a bill of material for components, usually assemblies that exist only temporarily; they are never inventoried.
(Short Answer)
4.8/5
(65)
Describe the role of record accuracy in Wheeled Coach's successful use of MRP. Is this company's experience the exception or the rule?
Answer in a well-developed paragraph.
(Essay)
4.8/5
(77)
Dependent demand and independent demand items differ in that
(Multiple Choice)
4.8/5
(84)
In general, the lot-for-lot approach should be used whenever economical.
(True/False)
4.9/5
(81)
Product A is made from 2 Bs and 1 C. Lead times for A, B, and C are 2, 3, and 2 weeks respectively. Currently there are 2 Bs and a 5 Cs on hand, with 5 of each scheduled to arrive at the end of week 1. If 20 As are needed during week 4, can the order be completed (it is the start of week 0 currently)?
(Essay)
4.8/5
(82)
Which of the following is not a disadvantage of ERP systems?
(Multiple Choice)
4.9/5
(70)
A paint company mixes ten different base colors into 3,000 different color options. If the MPS is organized around the ten different base colors their bills of material are classified as
(Multiple Choice)
4.9/5
(64)
If safety stock is desired it should be built into which portion of MRP?
(Multiple Choice)
4.8/5
(88)
The __________ is (are) the MRP input detailing which end items are to be produced, when they are needed, and in what quantities.
(Multiple Choice)
4.7/5
(70)
Showing 101 - 120 of 169
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)