Exam 4: Development Life Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

System failures often occur when not enough attention is devoted to ________ management from the beginning.

(Multiple Choice)
4.8/5
(81)

A(n) ________ analysis is used to compare the functions provided by the ERP system to the operational processes necessary to run the business.

(Multiple Choice)
4.8/5
(72)

In developing an ERP system, the focus is more on the business processes rather than the traditional focus on getting the user requirements. Why is this a major difference?

(Essay)
4.7/5
(91)

To keep the costs down and also to minimize the chance of surprises, it is generally a good rule of thumb to minimize the number of:

(Multiple Choice)
5.0/5
(72)

How is the traditional ERP life cycle different from the traditional SDLC?

(Essay)
4.9/5
(83)

At the end of the investigation phase, a report is prepared for management and stakeholders.

(True/False)
4.9/5
(77)

The value proposition helps to ensure that the ERP solution being considered makes sound business sense.

(True/False)
4.7/5
(93)

An example of a deliverable that would be due at the end of each stage of the traditional ERP life cycle would be a(n):

(Multiple Choice)
4.8/5
(84)

In the ERP life cycle, one of the key early decisions is the ________ selection.

(Multiple Choice)
4.9/5
(88)

The ASAP methodology makes use of predefined business tiers.

(True/False)
4.8/5
(79)

EUD is applicable to ERP systems for designing the underlying database applications.

(True/False)
4.8/5
(77)

In the analysis phase, the development team should focus on finding all the bottlenecks and constraints of the existing system.

(True/False)
4.8/5
(64)

The traditional SDLC methodology breaks system development into six different phases.

(True/False)
4.8/5
(77)

In the traditional ERP life cycle, by the end of the ________ stage, the team should have a prototype or sandbox of the ERP software up and running and accessible to the entire team, consultants, and SMEs.

(Multiple Choice)
4.7/5
(82)

ERP system development projects are not very complex so they don't need a structured development process.

(True/False)
4.9/5
(75)

For ERP implementations, it is best if the ________ is composed of people with a wide variety of IT and business skills.

(Multiple Choice)
4.8/5
(74)

Hardware and software are acquired and installed in the ________ of the traditional SDLC life cycle.

(Multiple Choice)
4.9/5
(78)

Compared with the traditional SDLC, the ERP life cycle is more focused on reengineering organizational ________ and change management.

(Multiple Choice)
4.9/5
(86)

The ERP life cycle expands at a much faster pace than in the traditional SDLC.

(True/False)
4.9/5
(75)

The investigation phase should be conducted by the IT department.

(True/False)
4.7/5
(80)
Showing 21 - 40 of 84
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)