A project is represented by the following diagram: A project is represented by the following diagram:   The expected duration of this project is: The expected duration of this project is:

(Multiple Choice)
4.9/5
(75)

All of the following are advantages to using a project management software package, except that

(Multiple Choice)
4.9/5
(81)

The task of identifying risks should involve everyone associated with the project.

(True/False)
4.9/5
(88)

Suppose a project is subject to the following risk events (each with a given probability of occurring and a cost associated with that occurrence): Suppose a project is subject to the following risk events (each with a given probability of occurring and a cost associated with that occurrence):   Given these, Event _____ should probably get the most attention and Event _____ should probably get the least. Given these, Event _____ should probably get the most attention and Event _____ should probably get the least.

(Multiple Choice)
4.8/5
(81)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the probability that the critical path for this project will be completed within 210 days? What is the probability that the critical path for this project will be completed within 210 days?

(Multiple Choice)
4.8/5
(83)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the estimated expected (mean)time for project completion? What is the estimated expected (mean)time for project completion?

(Multiple Choice)
5.0/5
(78)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the estimated standard deviation in the time for activity E? What is the estimated standard deviation in the time for activity E?

(Multiple Choice)
4.8/5
(80)

Which of the following would probably not involve the use of PERT?

(Multiple Choice)
4.7/5
(79)

Project risk events tend to be unlikely __________ a project, but that's also when they tend to be the __________.

(Multiple Choice)
4.9/5
(89)

The earliest finish time for an activity is equal to the latest finish time minus the activity time.

(True/False)
4.7/5
(79)

Good project management is very important with virtual teams.

(True/False)
4.9/5
(85)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the estimated expected (mean)time for project completion? What is the estimated expected (mean)time for project completion?

(Multiple Choice)
4.7/5
(77)

The probability that the project will go beyond the desired time is equal to one minus the joint probability that all paths will be completed within the desired time.

(True/False)
4.9/5
(88)

If an activity is determined to be on the critical path, that means that unlike activities that are not on the critical path, it will affect project

(Multiple Choice)
4.9/5
(86)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the estimated slack time for activity A? What is the estimated slack time for activity A?

(Multiple Choice)
4.9/5
(88)

Which decision in project management has typical factors that include budget, availability of appropriate knowledge, and cost-benefit considerations?

(Multiple Choice)
4.9/5
(73)

A hierarchical listing of what must be done during a project is called matrix.

(True/False)
4.9/5
(64)

A Gantt chart is apopular visual tool for displaying the established precedence relationships.

(True/False)
4.8/5
(77)

In "crashing" a project, a manager will generally focus on activities which

(Multiple Choice)
5.0/5
(77)

A node has one entering activity, a, and two leaving activities, b and c. Given the following information, determine the latest starting time for activity a: EFb = 15, EFc = 17, LFb = 24, LFc = 27; activity times are a = 4, b = 6, c = 8.

(Multiple Choice)