Exam 18: Material Requirements Planning
Exam 1: Operations and Supply Chain Management65 Questions
Exam 2: Strategy and Sustainability63 Questions
Exam 3: Product and Service Design55 Questions
Exam 4: Strategic Capacity Management66 Questions
Exam 5: Process Analysis54 Questions
Exam 6: Production Processes46 Questions
Exam 7: Service Processes66 Questions
Exam 8: Health Care Processes60 Questions
Exam 9: Six-Sigma Quality66 Questions
Exam 10: Projects70 Questions
Exam 11: Global Sourcing and Procurement64 Questions
Exam 12: Location, Logistics and Distribution53 Questions
Exam 13: Lean and Sustainable Supply Chains70 Questions
Exam 14: Enterprise Resource Planning Systems37 Questions
Exam 15: Demand Management and Forecasting75 Questions
Exam 16: Sales and Operations Planning60 Questions
Exam 17: Inventory Control71 Questions
Exam 18: Material Requirements Planning66 Questions
Exam 19: Scheduling57 Questions
Exam 20: Constraint Management56 Questions
Select questions type
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.7/5
(92)
When implemented correctly, MRP links all areas of the business.
(True/False)
4.8/5
(88)
Which of the following is most closely related to the reason a firm might implement MRP?
(Multiple Choice)
4.8/5
(87)
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance set-up cost and carrying cost.
(True/False)
4.8/5
(81)
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
(True/False)
4.9/5
(78)
Since MRP systems focus on batch or lot-sized orders and JIT is focused on individual item production, the two systems are incompatible and cannot work together.
(True/False)
4.8/5
(93)
The master production schedule states the number of items to be produced during specific time periods.
(True/False)
4.9/5
(81)
Which of the following is an input to the master production schedule?
(Multiple Choice)
5.0/5
(88)
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
(True/False)
4.8/5
(70)
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
(True/False)
4.8/5
(82)
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
(True/False)
4.9/5
(75)
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
(True/False)
4.7/5
(85)
Which of the following is an input file necessary to run an MRP system?
(Multiple Choice)
5.0/5
(99)
"Projected available balance" is a term referring to unsold finished goods inventory.
(True/False)
4.8/5
(82)
Which of the following is not a production activity report generated by MRP?
(Multiple Choice)
4.9/5
(75)
Which of the following industry types has high expected benefits from the application of MRP?
(Multiple Choice)
4.9/5
(87)
A modular bill of materials includes items with fractional options.
(True/False)
4.9/5
(84)
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
(True/False)
4.9/5
(78)