Exam 19: Scheduling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not one of the major functions of shop-floor control?

(Multiple Choice)
4.9/5
(74)

In production scheduling the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.

(True/False)
4.8/5
(92)

Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.

(True/False)
4.8/5
(84)

The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow, and scheduling lies at the heart of the process."

(True/False)
5.0/5
(82)

The assignment method is useful in solving scheduling problems that have which of the following characteristics?

(Multiple Choice)
5.0/5
(81)

Which of the following is not a way in which a work center can be organized?

(Multiple Choice)
4.9/5
(68)

The assignment method of job sequencing is a special case of the transportation method of linear programming.

(True/False)
4.8/5
(74)

For a low-volume job shop type of manufacturing which of the following is the typical production scheduling approach?

(Multiple Choice)
4.8/5
(81)

In finite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.

(True/False)
4.8/5
(90)

A work center is a physical area of the business in which productive resources are organized and work is completed.

(True/False)
4.9/5
(88)

Scheduling hourly work times using the "first hour principle" insures that no excess labor will be used during the work shift.

(True/False)
4.7/5
(89)

For a mid-volume type of manufacturing which of the following is the typical production scheduling approach?

(Multiple Choice)
4.8/5
(74)

MES and SES are acronyms for "Manufacturing Environment Scheduler" and "Service Environment Scheduler" systems, respectively.

(True/False)
4.9/5
(87)

The objectives of work center scheduling include which of the following?

(Multiple Choice)
4.9/5
(71)

Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

(Multiple Choice)
4.9/5
(83)

Which of the following is not an objective of work center scheduling?

(Multiple Choice)
4.7/5
(78)

For a high-volume type of manufacturing which of the following is the typical production scheduling approach?

(Multiple Choice)
4.8/5
(78)
Showing 41 - 57 of 57