Exam 9: Material Requirements Planning
Exam 1: Operations and Supply Chain Management73 Questions
Exam 2: Strategy and Sustainability49 Questions
Exam 3: Forecasting94 Questions
Exam 4: Strategic Capacity Management58 Questions
Exam 5: Projects75 Questions
Exam 6: Manufacturing Processes59 Questions
Exam 7: Service Processes83 Questions
Exam 8: Sales and Operations Planning61 Questions
Exam 9: Material Requirements Planning86 Questions
Exam 10: Quality Management and Six Sigma136 Questions
Exam 11: Inventory Management105 Questions
Exam 12: Lean Supply Chains74 Questions
Exam 13: Global Sourcing and Procurement70 Questions
Exam 14: Location, Logistics, and Distribution57 Questions
Select questions type
Which of the following is one of the main purposes of a MRP system?
(Multiple Choice)
4.8/5
(70)
We would expect to see which of the following in an MRP system's inventory status file?
(Multiple Choice)
4.9/5
(86)
From the list below select the one item that the master scheduler does not do to ensure good master scheduling.
(Multiple Choice)
4.9/5
(69)
In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
(True/False)
4.8/5
(80)
Which of the following is a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost?
(Multiple Choice)
4.9/5
(81)
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal?
(Multiple Choice)
4.8/5
(68)
If annual demand is 12,000 units, annual holding cost is $15 per unit, and setup cost per order is $25, which of the following is the EOQ lot size?
(Multiple Choice)
4.8/5
(73)
The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
(True/False)
4.8/5
(82)
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
(True/False)
4.7/5
(70)
Net change MRP reflects the exact status of each item managed by the system in "real time."
(True/False)
4.9/5
(84)
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become more "lumpy."
(True/False)
4.8/5
(77)
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance setup cost, carrying cost and cost of stock-outs.
(True/False)
4.9/5
(77)
Which of the following is an input file necessary to run an MRP system?
(Multiple Choice)
4.7/5
(78)
Which of the following is not a production activity report generated by MRP?
(Multiple Choice)
4.9/5
(71)
MRP is most valuable where a number of products are made in batches using the same productive equipment.
(True/False)
4.8/5
(82)
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.8/5
(85)
Which of the following is considered a primary report in an MRP system?
(Multiple Choice)
4.9/5
(83)
Which of the following is an input to the master production schedule (MPS)?
(Multiple Choice)
4.8/5
(80)
Showing 61 - 80 of 86
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)