Exam 9: Material Requirements Planning
Exam 1: Operations and Supply Chain Management73 Questions
Exam 2: Strategy and Sustainability49 Questions
Exam 3: Forecasting94 Questions
Exam 4: Strategic Capacity Management58 Questions
Exam 5: Projects75 Questions
Exam 6: Manufacturing Processes59 Questions
Exam 7: Service Processes83 Questions
Exam 8: Sales and Operations Planning61 Questions
Exam 9: Material Requirements Planning86 Questions
Exam 10: Quality Management and Six Sigma136 Questions
Exam 11: Inventory Management105 Questions
Exam 12: Lean Supply Chains74 Questions
Exam 13: Global Sourcing and Procurement70 Questions
Exam 14: Location, Logistics, and Distribution57 Questions
Select questions type
Which of the following is not a lot sizing technique used in MRP systems?
(Multiple Choice)
4.9/5
(84)
Which of the following is an input file necessary to run an MRP system?
(Multiple Choice)
4.9/5
(85)
Under the lot-for-lot (L4L) lot sizing technique as used in MRP, we would expect which of the following?
(Multiple Choice)
5.0/5
(91)
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000, inventory on hand is 1,200, and planned receipts are 800?
(Multiple Choice)
4.8/5
(84)
One of the main purposes of a MRP system is which of the following?
(Multiple Choice)
5.0/5
(74)
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
(True/False)
4.7/5
(92)
The time-phased plan specifying how many and when the firm plans to build each end item is called the materials requirements plan (MRP.)
(True/False)
4.8/5
(91)
Low level coding in MRP indicates the exact status of each item managed by the system in "real time."
(True/False)
4.7/5
(79)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?
(Multiple Choice)
4.9/5
(77)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?
(Multiple Choice)
4.9/5
(85)
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
(True/False)
4.9/5
(82)
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
(True/False)
4.9/5
(77)
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance setup cost and carrying cost.
(True/False)
4.8/5
(76)
The lot-for-lot (L4L) lot sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
(True/False)
4.9/5
(86)
In an MRP problem, A is an MPS item. Every A requires 3 B's and 2 C's. Every B requires 5 C's. All lead times are one period. Initial inventory values for all items are 0. Use lot-for-lot method for order quantities for all items. If gross requirement for A is 400 in period 10, what will be the planned order release for C in period 8?