Exam 12: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not listed in the textbook as a component of a lean supply chain?

(Multiple Choice)
4.9/5
(89)

"Quality at the source" requires factory workers to become their own inspectors.

(True/False)
4.7/5
(72)

Which of the following problems are not among those hidden when inventory levels are excessively high?

(Multiple Choice)
4.8/5
(90)

In a lean production system we expect to see which of the following?

(Multiple Choice)
4.8/5
(99)

You have been called in as a consultant to set up a kanban control system. The first thing you do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be set at 5% of the demand during lead time. The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours. Which of the following is the number of kanban card sets necessary to support this situation?

(Multiple Choice)
4.9/5
(83)

Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach. What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?

(Multiple Choice)
4.9/5
(70)

In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 20% of the demand during lead time, the container size is 4. If the lead time to replenish an order is 8 hours, what number of kanban card sets is needed?

(Multiple Choice)
5.0/5
(85)

JIT manufacturing forces a firm to work with a lower water level despite safety hazards.

(True/False)
4.9/5
(68)

Company unions in Japan exist to foster a cooperative relationship with management.

(True/False)
4.9/5
(76)

A principle of value stream mapping is to concentrate on speeding up value-added operations.

(True/False)
4.9/5
(91)

Value stream mapping involves materials, not information.

(True/False)
4.7/5
(66)

The Toyota Production System identified which of the following types of waste to be eliminated?

(Multiple Choice)
5.0/5
(86)

Group technology cells help to eliminate movement and queue (wait) time between operations.

(True/False)
4.9/5
(82)

You have been called in as a consultant to set up a kanban control system. The first thing to do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25% of the demand during lead time. The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of kanban card sets necessary to support this situation?

(Multiple Choice)
4.9/5
(86)

One of the aims of value stream mapping to eliminate waste in a process.

(True/False)
4.8/5
(79)

One of the many lean techniques that have been successfully applied in service firms is the upgrading of housekeeping.

(True/False)
4.8/5
(80)

Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.

(True/False)
4.8/5
(71)

In implementing a lean production system you should work with suppliers to do which of the following?

(Multiple Choice)
5.0/5
(70)

To implement a flow process in developing a lean system a firm might do which of the following?

(Multiple Choice)
4.9/5
(80)

Applying lean concepts in manufacturing balances increases in cost with quality improvement.

(True/False)
4.9/5
(68)
Showing 41 - 60 of 74