Exam 12: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Consider the relationship between the number of kanban cars sets needed with safety stock and the container size. Choose the most appropriate answer.

(Multiple Choice)
4.9/5
(75)

You have been called in as a consultant to set up a kanban control system. The first thing to do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. You found that the number of kanban cards needed is 47. Your client now tells you that they miscalculated the demand and the true demand is 300 per hour. All other things remain the same. What is the most appropriate answer from the choices below?

(Multiple Choice)
4.8/5
(80)

Using the formula in the textbook the only parameters we need to determine the number of kanban car sets is the average number of units demanded over some time period, the container size, and the safety stock.

(True/False)
4.7/5
(83)

Firms in Japan tend to have short-term relationships with their suppliers and customers.

(True/False)
4.9/5
(92)

Subcontractor networks are not very important in Japanese manufacturing.

(True/False)
4.9/5
(87)

To implement lean production schedules a firm would do which of the following?

(Multiple Choice)
4.8/5
(85)

Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.

(True/False)
4.8/5
(76)

In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20% of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what is the number of kanban card sets needed?

(Multiple Choice)
4.9/5
(78)

A kaizen burst is an overfilled kanban container.

(True/False)
4.9/5
(70)

The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.

(True/False)
4.9/5
(73)

The goal of JIT production is to drive all inventory queues lower.

(True/False)
4.9/5
(80)

Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, work in process, and finished goods.

(True/False)
4.9/5
(80)

One of the many lean techniques that have been successfully applied in service firms is the eliminating of unnecessary activities.

(True/False)
4.9/5
(85)

"Kanban Squares" is an educational game played in kanban training sessions.

(True/False)
4.9/5
(82)

The Toyota Production System identified which of the following types of waste to be eliminated?

(Multiple Choice)
4.8/5
(77)

Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900s.

(True/False)
4.8/5
(70)

Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.

(True/False)
4.7/5
(79)

A kaizen burst is a symbol on a value stream map.

(True/False)
4.9/5
(75)

The Toyota Production System identified which of the following types of waste to be eliminated?

(Multiple Choice)
4.9/5
(76)

Which of the following is a lean production technique that has been successfully applied in service firms?

(Multiple Choice)
5.0/5
(74)
Showing 21 - 40 of 74