What are the supply chain implications of the lean system emphasis on small lot sizes?

(Essay)
4.8/5
(76)

List and briefly define the 5S Practices that serve as an enabler and essential foundation of lean systems.

(Essay)
4.9/5
(74)

"When in doubt,weed it out" describes which 5S element?

(Multiple Choice)
5.0/5
(85)

An important mechanism for lean systems is a Kanban system.Which one of the following statements correctly describes the behavior of a two-card Kanban system?

(Multiple Choice)
4.8/5
(73)

Kaizen is the Japanese term for continuous improvement.

(True/False)
4.7/5
(78)

A value stream map shows the flows of materials and information and the lines of responsibility and authority.

(True/False)
4.9/5
(76)

A ________ assembly line produces a mix of models in smaller lots.

(Essay)
4.9/5
(69)

Mixed-model assembly is a type of assembly that produces a mix of models in smaller lots.

(True/False)
4.9/5
(79)

In the Toyota Production System,when a work station needs more material,it is obvious to both the worker and the supplier that material is needed.Further,the amount needed must be understood as well as the delivery time for replenishment.

(True/False)
4.8/5
(76)

________ refers to a form of supplier partnership that places a supplier representative,who is empowered to plan and schedule the replenishment of materials from the supplier,in the customer's plant on a full-time basis.

(Essay)
4.8/5
(97)

What is the output for a process that has a takt time of 1.25 minutes per unit?

(Essay)
4.8/5
(77)

Firms that have highly repetitive processes and well-defined work flows of standardized items often use the pull method.

(True/False)
4.9/5
(72)

All improvements to the Toyota Production System must be made at the ________ level.

(Essay)
4.8/5
(84)

Happiness,Inc.uses a Kanban system.The daily demand for the most critical part,the Smylie,is 400 units over an eight-hour production period.The average waiting time for a container of Smylies is 30 minutes.The processing time for a container filled with Smylies is 6 minutes,and a container holds 5 units.If the company wishes to use a 5% policy variable,how many containers are needed?

(Essay)
4.8/5
(89)

Scenario 6.1 El Gran Raton,the producers of the finest carpincho wallets in all of Argentina,examined their production process in the form of a value stream map,displayed below. Scenario 6.1 El Gran Raton,the producers of the finest carpincho wallets in all of Argentina,examined their production process in the form of a value stream map,displayed below.   Daniel Penfield artist -Use the value stream map to conduct a complete analysis of the carpincho wallet production process.Calculate all raw material and WIP lead times and determine overall process capacity assuming El Gran Raton uses a batch size of 300 units.If a single carpincho wallet were ordered today,how long before it would reach the back pocket of the delighted customer if his order is but one of an average of 2230 orders (all for a single wallet)during an average 5 day work week.*Assume that the days indicated on the lead time ladder are based on a different batch size and not applicable to the 300 unit batch currently in use.* Daniel Penfield artist -Use the value stream map to conduct a complete analysis of the carpincho wallet production process.Calculate all raw material and WIP lead times and determine overall process capacity assuming El Gran Raton uses a batch size of 300 units.If a single carpincho wallet were ordered today,how long before it would reach the back pocket of the delighted customer if his order is but one of an average of 2230 orders (all for a single wallet)during an average 5 day work week.*Assume that the days indicated on the lead time ladder are based on a different batch size and not applicable to the 300 unit batch currently in use.*

(Essay)
4.8/5
(74)

In lean systems,work-in-process inventory is a direct result of overproduction and waiting.

(True/False)
4.8/5
(90)

________ is the philosophy that waste can be eliminated by cutting unnecessary inventory and removing non-value-adding activities in operations.

(Essay)
4.7/5
(75)

The just-in-time (JIT)system is a(n):

(Multiple Choice)
4.8/5
(85)

Which of the following statements about the Toyota Production System is BEST?

(Multiple Choice)
4.9/5
(77)

What did the production manager say to the pile of scrapped material?

(Multiple Choice)
4.8/5
(78)
Showing 121 - 140 of 164