Exam 6: Lean Systems
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
What are the supply chain implications of the lean system emphasis on close supplier ties?
Free
(Essay)
5.0/5
(75)
Correct Answer:
Close supplier ties lead to partnerships with a relatively few number of suppliers in close geographic locations.It helps firms get frequent supplier shipments,have short lead time,on-time scheduled arrival of goods of high quality,with deliveries as often as several times per day.Close cooperation leads to better inventory planning and scheduled deliveries that improve both customer and supplier profit margins.Sometimes,a JIT II system is used with the supplier having a representative in the customer's plant,and this representative is then empowered to plan and schedule the replenishment of materials from the supplier.
A ________ is a card used to control the flow of production through a factory.
Free
(Essay)
4.8/5
(87)
Correct Answer:
Kanban
To complete the current state drawing of a process,a map of the current situation is developed,including such items as material and information flows,process times,setup times,batch sizes,scrap rates,and number of people required.
Free
(True/False)
4.9/5
(78)
Correct Answer:
True
The Peeps factory can be described as a three step process consisting of Mixing,Forming,and Packaging.Peeps are made in batches of 1000 and have a daily demand of 75,000 units during what the plant manager likes to call "the Peep season." Mixing has a cycle time of .02 seconds with a setup time of 30 seconds;Forming has a setup time of 24 seconds and a cycle time of .03 seconds,and Packaging has a setup time of 15 seconds with a cycle time of .04 seconds.Each process step is handled by one operator,who is available for 8 hours a day.What is the process bottleneck if each process step is assumed to have 100% uptime?
(Essay)
4.8/5
(92)
Use the data in Scenario 6.1 to determine the batch size necessary to restrict overall process capacity to 10 units per hour.
(Multiple Choice)
4.9/5
(81)
In lean systems,if a defective product is found,which of the following is generally NOT done?
(Multiple Choice)
5.0/5
(81)
Just-in-time (JIT)systems rely on inspectors to inspect quality into the product.
(True/False)
4.8/5
(79)
Quality at the source is a philosophy whereby defects are caught and corrected where they are created.
(True/False)
4.8/5
(75)
With a batch size of 300 units,what is the per unit processing time for Process C?
(Multiple Choice)
4.8/5
(63)
Just-in-time (JIT)systems need close relationships with suppliers.
(True/False)
4.9/5
(84)
________ is a qualitative lean tool for eliminating waste that involves current state and future state drawings,and an implementation plan.
(Essay)
5.0/5
(87)
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called jidoka.
(True/False)
4.8/5
(83)
Items to be assembled that fit together only the proper way are an example of:
(Multiple Choice)
4.8/5
(84)
All improvements to the Toyota Production System must be made using the ________ method.
(Essay)
4.8/5
(83)
In Scenario 6.1,what does the triangle between Process A and Process B represent?
(Multiple Choice)
4.8/5
(84)
Preventive maintenance is typically given very low priority in just-in-time systems.
(True/False)
4.8/5
(74)
One big advantage of lean systems is that they can usually be put in place without any major changes to existing layouts.
(True/False)
4.9/5
(75)
Which of the following is a process consideration in the implementation of a lean system?
(Multiple Choice)
4.8/5
(78)
List and briefly define the eight types of waste (or muda)that often occur in firms which must be eliminated in implementing lean systems.
(Essay)
4.9/5
(76)
Weeding out unnecessary items,neatly arranging what's left,and cleaning the work area are components of:
(Multiple Choice)
4.9/5
(77)
Showing 1 - 20 of 164