Exam 6: Lean Systems
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
What are some of the approaches used to achieve the high quality levels associated with lean systems?
(Essay)
4.7/5
(66)
Case 6.2
The Jewel Golf Club Company,which recently began using a Kanban system,has had problems with high inventory levels of one of the handle grips used to make several versions of its clubs.Daily demand for the grip is 3000 units,average waiting time during production is 0.20 day,processing time is 0.10 day per container,and a container holds 150 grips.
-Use the information in Case 6.2.How many Kanban containers would Jewel require if a 10% policy variable is used?
(Multiple Choice)
4.8/5
(89)
Push systems are often used in firms with highly repetitive processes and well defined work flows of standardized items.
(True/False)
4.9/5
(82)
A ________ is a workstation in which a worker operates several different machines simultaneously to achieve a line flow.
(Essay)
4.9/5
(80)
The pathway for every service and product in the Toyota Production System must be ________ and ________.
(Essay)
4.9/5
(87)
Champion Cooling Company uses a kanban system at their two locations in the Oklahoma City Metroplex.The daily demand for fans is 2000 at each location and management insists on using the same alpha level (0.1)at both locations.Location Reno uses containers that hold 20 items and takes 0.04 of a day to process a container.It takes 0.07 of a day to get a container filled and for it to wait during its cycle.Location Western uses containers that hold 24 items and takes 0.02 of a day to process a container.It takes 0.08 of a day to get a container filled and for it to wait during its cycle.Which location has the higher level of inventory? Assume that both locations round up to the next highest integer number of containers.
(Essay)
4.8/5
(76)
________ is the leveling of production load by both volume and product mix.
(Essay)
4.9/5
(65)
The rack at my assembly station that holds rear view mirrors is empty,so a runner wheels it away and replaces it with a new rack,fully populated with rear view mirrors.This production factoid illustrates which of the following principles of the Toyota Production System?
(Multiple Choice)
4.8/5
(81)
________ is a methodology consisting of five workplace practices that are conducive to visual controls and lean production.
(Essay)
4.9/5
(101)
Toyota sets up all of its operations as experiments and teaches employees at all levels how to use the trial and error method of problem solving.
(True/False)
4.8/5
(79)
Scenario 6.1 shows a value stream map with the picture separated into a top and bottom halves,each encircled by a dashed line.The bottom half of the picture could best be described as representing the:
(Multiple Choice)
4.8/5
(69)
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,manufacturing an item before it is needed is part of which general waste category?
(Multiple Choice)
4.8/5
(61)
While lean systems work very well for manufacturing systems,they cannot be applied to service systems.
(True/False)
4.8/5
(65)
Which of the following actions would increase the number of containers in use in a Kanban system?
(Multiple Choice)
4.9/5
(73)
Using customer demand to activate production of an item or service is called:
(Multiple Choice)
4.9/5
(77)
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called ________.
(Essay)
4.7/5
(77)
The Toyota Production System requires that any process improvements are to be made at the lowest level of the organization.
(True/False)
4.8/5
(75)
Productivity tends to increase when components are standardized because each worker performs a standardized task or work method more often each day.
(True/False)
4.9/5
(77)
Showing 61 - 80 of 164
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)