Favorable standard cost variances are normally closed at the end of the period by:

(Multiple Choice)
4.9/5
(83)

In setting standard costs, management's expectations are that the standard costs will always be met.

(True/False)
4.9/5
(70)

An important advantage of a standard cost system is that standard costs:

(Multiple Choice)
4.7/5
(80)

Accounting terminology Listed below are seven technical accounting terms introduced or emphasized in this chapter: Each of the following statements may (or may not) describe one of these technical terms. In the space provided beside each statement, indicate the accounting term described, or answer "None" if the statement does not correctly describe any of the terms. ______ (a) A materials variance which is the responsibility of the Purchasing Department. ______ (b) The variance which exists whenever actual production levels differ from normal levels. ______ (c) Unit costs expected to be incurred under normal conditions. ______ (d) A labor variance caused by a difference between standard and actual hours required to complete a task. _____ (e) The variance caused by incurring more overhead costs than allowed for at a given level of production. Labor rate variance Labor efficiency variance Volume variance Materials price variance Standard costs Materials quantity variance Overhead spending variance

(Essay)
4.7/5
(90)

An unfavorable overhead volume variance results from:

(Multiple Choice)
4.9/5
(83)

The purchasing manager is often included in evaluating cost variances.

(True/False)
4.8/5
(77)

A favorable variance occurs when actual costs are less than standard costs.

(True/False)
4.9/5
(87)

If the standard quantity of materials is 84,500 units @ $0.15 per unit and the actual quantity is 95,000 units @ $0.12 per unit, then the materials quantity variance is:

(Multiple Choice)
4.9/5
(78)

Which statement is true regarding a standard cost system?

(Multiple Choice)
5.0/5
(69)

Under standard cost procedures, any differences between actual costs and standard costs are:

(Multiple Choice)
4.9/5
(83)

A material price variance is arrived at by taking standard quantity times actual price, less standard price.

(True/False)
5.0/5
(69)

What is the standard cost for direct materials?

(Multiple Choice)
4.9/5
(77)

With respect to labor costs, Roman's production manager is responsible for:

(Multiple Choice)
4.8/5
(78)

James's materials price variance for June is:

(Multiple Choice)
4.9/5
(83)

The journal entry to record the cost of direct materials used in June includes each of the following except:

(Multiple Choice)
4.8/5
(61)

The materials quantity variance for James's June operations is:

(Multiple Choice)
4.8/5
(71)

Caesar, Inc. purchased and used 47,600 pounds of goods to produce an actual quantity of 15,300 units. Each unit required 3 pounds of goods. The quantity variance was $10,200 unfavorable and the price variance was $7,140 unfavorable. What was the actual price and the standard price per pound?

(Essay)
4.9/5
(85)

Compute the following cost variances for job no. 007. Indicate whether each variance is favorable (F) or unfavorable (U). a. Materials price variance: $___________ b. Materials quantity variance: $___________ c. Labor rate variance: $___________ d. Labor efficiency variance: $___________

(Short Answer)
5.0/5
(63)

Standard costs actually are ideal costs per unit.

(True/False)
4.7/5
(81)

Factory overhead variances are usually recorded when:

(Multiple Choice)
5.0/5
(79)