Exam 24: Standard Cost Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Volume variances Consider the following statement: "No manager should be held responsible for a volume variance." Briefly explain why a volume variance should not be investigated and viewed as the responsibility of some manager in an organization.

Free
(Essay)
4.8/5
(86)
Correct Answer:
Verified

As long as the production departments of an organization are producing the desired number of units, the volume variance does not indicate either efficient or inefficient production. The volume variance arises from fluctuations in the level of production from month to month. Such fluctuations may occur for a variety of reasons such as seasonal demand, scheduled vacation time, etc. Unless the producing departments fail to produce the scheduled number of units, no manager should be viewed as responsible for the volume variance.

Which of the following is not an advantage of using a standard cost system?

Free
(Multiple Choice)
4.8/5
(83)
Correct Answer:
Verified

A

Standard cost system-overhead variances Assume the following data for John Company's August operations. (a) Compute the amount of overhead applied to Work-in-Process during August. $________________ (b) Compute the total manufacturing overhead budgeted based on hours worked during August. $________________ (c) Compute the overhead spending variance for August. Indicate whether favorable (F) or unfavorable (U). $________________ (d) Compute the overhead volume variance for August. Indicate whether favorable (F) or unfavorable (U). $________________ Standard cost system-overhead variances Assume the following data for John Company's August operations. (a) Compute the amount of overhead applied to Work-in-Process during August. $________________ (b) Compute the total manufacturing overhead budgeted based on hours worked during August. $________________ (c) Compute the overhead spending variance for August. Indicate whether favorable (F) or unfavorable (U). $________________ (d) Compute the overhead volume variance for August. Indicate whether favorable (F) or unfavorable (U). $________________

Free
(Essay)
4.9/5
(70)
Correct Answer:
Verified

The labor rate variance is determined by multiplying the difference between the actual labor rate and the standard labor rate by:

(Multiple Choice)
4.7/5
(75)

If the actual number of direct labor hours used exceeds the standard direct labor hours allowed, this indicates:

(Multiple Choice)
4.9/5
(80)

The use of excessive quantities of material in manufacturing a product causes an unfavorable materials quantity variance.

(True/False)
4.9/5
(80)

Standard costs are established only for direct labor and direct materials.

(True/False)
4.7/5
(84)

Standard cost system labor variance The following computations of March labor variances for Sam's Supply Company are incomplete. The missing items are labeled (a) through (d). Labor rate variance = 4,800 hours x [(a) - $8.50] = $350 favorable Labor efficiency variance = (b) x [(c) - 5,000 hours] = $(d) On the appropriately labeled line, identify each missing item by name (a through c) and show the missing value (a through d). Show supporting computations in the space provided. (a) _________________________ $________________ (b) _________________________ $________________ (c) _________________________ ____________________ hours (d) $_______________ F or U (Circle the correct term.) (e) During March, the supervisor left for vacation without arranging for a replacement. Which variances would have been most affected by this situation? _________________________ Computations

(Essay)
4.9/5
(82)

Excessive overtime hours worked by direct labor workers often results in:

(Multiple Choice)
4.9/5
(75)

The overhead spending variance:

(Multiple Choice)
4.8/5
(79)

A favorable variance would be credited to a cost variance account.

(True/False)
4.9/5
(83)

If fewer units are produced than had been estimated when standard unit costs were determined, there would normally be:

(Multiple Choice)
4.7/5
(69)

A standard cost is predetermined, that is, determined before actual costs of the current period have been computed.

(True/False)
4.9/5
(75)

If the standard quantity of materials is 84,500 units @ $0.15 per unit and the actual quantity is 95,000 units @ $0.12 per unit, then the materials price variance is:

(Multiple Choice)
4.9/5
(80)

There is an unfavorable labor efficiency variance when:

(Multiple Choice)
5.0/5
(74)

An unfavorable labor rate variance could most likely result from all of the following except:

(Multiple Choice)
4.9/5
(80)

Which of the following is the most likely explanation for the types of labor variances resulting from Roman's July operations?

(Multiple Choice)
4.9/5
(77)

A labor efficiency (usage) variance is most likely to occur if:

(Multiple Choice)
4.8/5
(69)

Using more direct labor hours for units produced than the amount allowed by the standard results in:

(Multiple Choice)
4.9/5
(65)

The journal entry to record direct labor costs relating to work performed in April includes:

(Multiple Choice)
4.7/5
(74)
Showing 1 - 20 of 130
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)