Exam 7: Flexible Budgets, direct-Cost Variances, and Management Control
Exam 1: The Manager and Management Accounting195 Questions
Exam 2: An Introduction to Cost Terms and Purposes224 Questions
Exam 3: Cost-Volume-Profit Analysis208 Questions
Exam 4: Job Costing199 Questions
Exam 5: Activity-Based Costing and Activity-Based Management176 Questions
Exam 6: Master Budget and Responsibility Accounting226 Questions
Exam 7: Flexible Budgets, direct-Cost Variances, and Management Control180 Questions
Exam 8: Flexible Budgets, overhead Cost Variances, and Management Control176 Questions
Exam 9: Inventory Costing and Capacity Analysis211 Questions
Exam 10: Determining How Costs Behave190 Questions
Exam 11: Decision Making and Relevant Information218 Questions
Exam 12: Strategy, balanced Scorecard, and Strategic Profitability Analysis172 Questions
Exam 13: Pricing Decisions and Cost Management210 Questions
Exam 14: Cost Allocation, customer-Profitability Analysis, and Sales-Variance Analysis167 Questions
Exam 15: Allocation of Support-Department Costs, common Costs, and Revenues150 Questions
Exam 16: Cost Allocation: Joint Products and Byproducts151 Questions
Exam 17: Process Costing149 Questions
Exam 18: Spoilage, rework, and Scrap153 Questions
Exam 19: Balanced Scorecard: Quality and Time151 Questions
Exam 20: Inventory Management, just-In-Time, and Simplified Costing Methods151 Questions
Exam 21: Capital Budgeting and Cost Analysis151 Questions
Exam 22: Management Control Systems, transfer Pricing, and Multinational Considerations153 Questions
Exam 23: Performance Measurement, compensation, and Multinational Considerations151 Questions
Select questions type
For critical items such as product defects,a small variance may prompt investigation.
(True/False)
4.9/5
(71)
Possible operational causes of an unfavorable direct materials efficiency variance include poor design of products or processes.
(True/False)
4.8/5
(70)
Answer the following questions using the information below:
Lander Corporation used the following data to evaluate their current operating system. The company sells items for $18 each and used a budgeted selling price of $18 per unit.
Actual Budgeted Units sold 41,000 units 40,000 units Variable costs \ 164,000 \ 156,000 Fixed costs \ 46,000 \ 48,000
-What is the static-budget variance of operating income?
(Multiple Choice)
4.8/5
(80)
Answer the following questions using the information below:
Berman's Camera Shop has prepared the following flexible budget for September and is in the process of interpreting the variances. F denotes a favorable variance and U denotes an unfavorable variance.
Flexible Variances Budget Price Efficiency Material A \ 40,000 \ 1,000 \ 3,000 Material B 60,000 500 1,500 Direct manufacturing labor 80,000 500 2,500
-The actual amount spent for direct manufacturing labor was ________.
(Multiple Choice)
4.8/5
(78)
A standard price is the minimum price a company will have to pay for a unit of input.
(True/False)
5.0/5
(81)
Answer the following questions using the information below:
These questions refer to flexible-budget variance formulas with the following descriptions for the variables: A = Actual; B = Budgeted; P = Price; Q = Quantity.
-The flexible-budget variance for materials is $5,000 (U).The sales-volume variance is $13,000 (U).The price variance for material is $31000 (F).The efficiency variance for direct manufacturing labor is $7,000 (F).Calculate the efficiency variance for materials.
(Multiple Choice)
4.8/5
(87)
Demizio Valley Orchards, Inc. (DVO), developed standard costs for direct material and direct labor. In 2015, DVO estimated the following standard costs for one of their most well loved products, the DVO classic Grandma's large apple pie which had a brown sugar coating on the top of the crust as well as including cranberry and mince ingredients in addition to the apples.
Budgeted quantity Budgeted price Direct materials 2.0 pounds \ 6.25 per pound Direct labor 0.20 hours \ 13.00 per hour During September, DVO produced and sold 1,100 pies using 2,300 pounds of direct materials at an average cost per pound of $6.00 and 200 direct labor hours at an average wage of $13.25 per hour.
-The direct material efficiency variance during September is ________.
(Multiple Choice)
4.8/5
(66)
Give at least three good reasons why a favorable price variance for direct materials might be reported.
(Essay)
5.0/5
(92)
Wilson's Winter Woolens manufactures jackets and other wool clothing.A certain designed ski parka requires the following:
Direct materials standard 2 square yards at per yard
Direct manufacturing labor standard hours at per hour During the third quarter,the company made 1,500 parkas and used 3,150 square yards of fabric costing $39,375.Direct labor totaled 2,100 hours for $45,150.
Required:
a.Compute the direct materials price and efficiency variances for the quarter.
b.Compute the direct manufacturing labor price and efficiency variances for the quarter.
(Essay)
4.8/5
(79)
Explain the difference between a static budget and a flexible budget.Explain what is meant by a static budget variance and a flexible budget variance.
(Essay)
4.7/5
(73)
The only difference between the static budget and flexible budget is that the static budget is prepared using planned output.
(True/False)
4.8/5
(74)
A variance within an acceptable range is considered to be an "in-control occurrence" and calls for no investigation or action by managers.
(True/False)
4.8/5
(75)
The textbook discusses three levels of variances,Level 0,Level 1,Level 2,and Level 3.Briefly explain the meaning of each of those levels and provide an example of a variance at each of those levels.
(Essay)
4.9/5
(77)
A favorable variance can be automatically interpreted as "good news."
(True/False)
4.8/5
(89)
A price variance reflects the difference between ________.
(Multiple Choice)
4.9/5
(82)
It is best to rely totally on financial performance measures rather than using a combination of financial and nonfinancial performance measures.
(True/False)
4.9/5
(83)
Answer the following questions using the information below:
The actual information pertains to the month of September. As a part of the budgeting process, Twilith Fencing Company developed the following static budget for September. Twilith is in the process of preparing the flexible budget and understanding the results.
Actual Results Flexible Budget static Budget Sales volume (in units) 12,000 15,000 Sales revenues \ 600,000 \ \ 750,000 Variable costs 307,200 \ 360,000 Contribution margin 292,800 \&7390,000 Fixed costs 274,800 \ 270,000 Operating profit \ 18,000 \ \ 120,000
-The flexible budget will report ________ for variable costs.
(Multiple Choice)
4.9/5
(93)
Direct manufacturing labor efficiency variance is likely to be unfavorable if underskilled workers are put on a job.
(True/False)
4.8/5
(67)
An unfavorable sales-volume variance could result from ________.
(Multiple Choice)
4.7/5
(85)