Exam 7: Flexible Budgets, direct-Cost Variances, and Management Control
Exam 1: The Manager and Management Accounting195 Questions
Exam 2: An Introduction to Cost Terms and Purposes224 Questions
Exam 3: Cost-Volume-Profit Analysis208 Questions
Exam 4: Job Costing199 Questions
Exam 5: Activity-Based Costing and Activity-Based Management176 Questions
Exam 6: Master Budget and Responsibility Accounting226 Questions
Exam 7: Flexible Budgets, direct-Cost Variances, and Management Control180 Questions
Exam 8: Flexible Budgets, overhead Cost Variances, and Management Control176 Questions
Exam 9: Inventory Costing and Capacity Analysis211 Questions
Exam 10: Determining How Costs Behave190 Questions
Exam 11: Decision Making and Relevant Information218 Questions
Exam 12: Strategy, balanced Scorecard, and Strategic Profitability Analysis172 Questions
Exam 13: Pricing Decisions and Cost Management210 Questions
Exam 14: Cost Allocation, customer-Profitability Analysis, and Sales-Variance Analysis167 Questions
Exam 15: Allocation of Support-Department Costs, common Costs, and Revenues150 Questions
Exam 16: Cost Allocation: Joint Products and Byproducts151 Questions
Exam 17: Process Costing149 Questions
Exam 18: Spoilage, rework, and Scrap153 Questions
Exam 19: Balanced Scorecard: Quality and Time151 Questions
Exam 20: Inventory Management, just-In-Time, and Simplified Costing Methods151 Questions
Exam 21: Capital Budgeting and Cost Analysis151 Questions
Exam 22: Management Control Systems, transfer Pricing, and Multinational Considerations153 Questions
Exam 23: Performance Measurement, compensation, and Multinational Considerations151 Questions
Select questions type
Quindo Table Company manufactures tables for schools.The 2015 operating budget is based on sales of 44,000 units at $55 per table.Operating income is anticipated to be $132,000.Budgeted variable costs are $35 per unit,while fixed costs total $660,000.
Actual income for 2015 was a surprising $477,000 on actual sales of 46,000 units at $57 each.Actual variable costs were $33 per unit and fixed costs totaled $627,000.
Required:
Prepare a variance analysis report with both flexible-budget and sales-volume variances.
Free
(Essay)
4.8/5
(74)
Correct Answer:
Quindo Table Company
Variance Analysis
Total flexible-budget variance = $217,000 favorable.
Total sales-volume variance = $40,000 favorable.
A purchasing manager's performance is best evaluated using the ________.
Free
(Multiple Choice)
4.9/5
(74)
Correct Answer:
D
Lunicious Corporation currently produces baseball caps in an automated process.Expected production per month is 15,000 units,direct material costs are $3.50 per unit,and manufacturing overhead costs are $40,000 per month.Manufacturing overhead is entirely fixed costs.What is the flexible budget for 12,000 and 15,000 units,respectively?
(Multiple Choice)
4.9/5
(90)
Answer the following questions using the information below:
The actual information pertains to the third quarter. As part of the budgeting process, the Duck Decoy Department of Paralith Incorporated had developed the following static budget for the third quarter. Duck Decoy is in the process of preparing the flexible budget and understanding the results.
Actual Flexible Static Results Budget Budget Sales volume (in units) 11,000 10,000 Sales revenues \ 238,000 \ \2 30,000 Variable costs 150,000 \ 180,000 Contribution margin 88,000 \ 50,000 Fixed costs 36,000 \ 35,000 Operating profit \ 52,000 \&\ 15,000
-The flexible-budget variance for variable costs is ________.
(Multiple Choice)
4.8/5
(70)
An unfavorable variance is conclusive evidence of poor performance.
(True/False)
4.8/5
(75)
Standard labor rate is $8 per hour.Standard labor allowed per unit is 0.6 hours.Actual cost per labor hour is $7.5 and actual labour hour per unit is 0.7 hours.What is the standard labor cost per output unit?
(Multiple Choice)
4.9/5
(87)
Answer the following questions using the information below:
These questions refer to flexible-budget variance formulas with the following descriptions for the variables: A = Actual; B = Budgeted; P = Price; Q = Quantity.
-The best label for the formula (AP - BP)AQ is the ________.
(Multiple Choice)
4.9/5
(95)
If manufacturing machines are breaking down more than expected,this will contribute to a(n)________.
(Multiple Choice)
4.8/5
(75)
Coffey Company maintains a very large direct materials inventory because of critical demands placed upon it for rush orders from large hospitals.Item A contains hard-to-get material Y.Currently,the standard cost of material Y is $4.00 per gram.During February,22,000 grams were purchased for $4.10 per gram,while only 20,000 grams were used in production.There was no beginning inventory of material Y.
Required:
a.Determine the direct materials price variance,assuming that all materials costs are the responsibility of the materials purchasing manager.
b.Determine the direct materials price variance,assuming that all materials costs are the responsibility of the production manager.
c.Discuss the issues involved in determining the price variance at the point of purchase versus the point of consumption.
(Essay)
4.8/5
(82)
Answer the following questions using the information below:
The actual information pertains to the month of September. As a part of the budgeting process, Twilith Fencing Company developed the following static budget for September. Twilith is in the process of preparing the flexible budget and understanding the results.
Actual Results Flexible Budget static Budget Sales volume (in units) 12,000 15,000 Sales revenues \ 600,000 \ \ 750,000 Variable costs 307,200 \ 360,000 Contribution margin 292,800 \&7390,000 Fixed costs 274,800 \ 270,000 Operating profit \ 18,000 \ \ 120,000
-The flexible budget will report ________ for the fixed costs.
(Multiple Choice)
4.9/5
(91)
Answer the following questions using the information below:
Genent Company manufactures tires. Some of the company's data was misplaced. Use the following information to replace the lost data:
Actual Flexible Budget Flexible Sales-Volume Static Results Variances Budget Variances Budget Units sold 495,000 495,000 453,750 Revenues \ 185,150 \ 4,400 () \ 6,160 () Variable costs () \ 880 \ 69,780 \ 10,300 \ 88,080 Fixed costs \ 36,430 \ 3,770 \ 40,200 0 \ 40,200 Operating income \ 78,060 () \ 70,770 () \ 66,630
-What are the actual variable costs (C)?
(Multiple Choice)
4.7/5
(77)
Answer the following questions using the information below:
Animent Industries, Inc. (AII), developed standard costs for direct material and direct labor. In 2015, AII estimated the following standard costs for one of their major products, the 10-gallon plastic container.
Budgeted quantity Budgeted price Direct materials 0.10 pounds \ 60 per pound Direct labor 0.05 hours \ 30 per hour During June, AII produced and sold 20,000 containers using 1,900 pounds of direct materials at an average cost per pound of $64 and 1,000 direct manufacturing labor-hours at an average wage of $30.50 per hour.
-June's direct material flexible-budget variance is ________.
(Multiple Choice)
4.8/5
(73)
A favorable price variance for direct manufacturing labor might indicate that ________.
(Multiple Choice)
4.8/5
(81)
A variance is the difference between the actual cost for the current and expected (or budgeted)performance.
(True/False)
4.9/5
(73)
Answer the following questions using the information below:
Contrafic Corporation used the following data to evaluate its current operating system. The company sells items for $21 each and used a budgeted selling price of $21 per unit.
Budgeted Units sold 180,000 units 185,000 units Variable costs \ 1,080,000 \ 1,295,000 Fixed costs \ 800,000 \ 775,000
-What is the static-budget variance of variable costs?
(Multiple Choice)
4.7/5
(74)
The following data for the telephone company pertain to the production of 450 rolls of telephone wire during June.Selected items are omitted because the costing records were lost in a windstorm.
Required:
Compute the missing elements in the report represented by the lettered items.
(Essay)
4.8/5
(67)
If variance analysis is used for performance evaluation,managers are encouraged to meet targets using creativity and resourcefulness.
(True/False)
4.9/5
(79)
Which of the following is an example of nonfinancial performance measure?
(Multiple Choice)
4.9/5
(83)
Showing 1 - 20 of 180
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)