Exam 20: Total Quality Management
Exam 1: A Preview of Business Statistics55 Questions
Exam 2: Visual Description of Data67 Questions
Exam 3: Statistical Description of Data146 Questions
Exam 4: Data Collection and Sampling Methods104 Questions
Exam 5: Probability: Review of Basic Concepts188 Questions
Exam 6: Discrete Probability Distributions140 Questions
Exam 7: Continuous Probability Distributions160 Questions
Exam 8: Sampling Distributions108 Questions
Exam 9: Estimation From Sample Data150 Questions
Exam 10: Hypothesis Tests Involving a Sample Mean or Proportion170 Questions
Exam 11: Hypothesis Tests Involving Two Sample Means149 Questions
Exam 12: Analysis of Variance Tests173 Questions
Exam 13: Chi-Square Applications134 Questions
Exam 14: Nonparametric Methods139 Questions
Exam 15: Simple Linear Regression and Correlation145 Questions
Exam 16: Multiple Regression and Correlation98 Questions
Exam 17: Model Building83 Questions
Exam 18: Models for Time Series and Forecasting127 Questions
Exam 19: Decision Theory82 Questions
Exam 20: Total Quality Management132 Questions
Select questions type
Which of the following describes the purpose of acceptance sampling (defect-detection)?
(Multiple Choice)
4.9/5
(79)
When no point lies outside the control limits of a chart,we conclude that:
(Multiple Choice)
4.8/5
(81)
Costs that occur as the result of poor quality are also known as ____________________.
(Short Answer)
4.9/5
(78)
The four letters in W.Edwards Deming's PDCA cycle stand for ____________________.
(Short Answer)
5.0/5
(87)
A random sample of 100 rods from a process with a mean of 20 feet produced a sample mean of 20.01 feet and a standard deviation of 0.015.This difference between the process mean and the sample mean is likely to be:
(Multiple Choice)
4.9/5
(75)
The visual display of effects and their possible causes as a method of problem solving is associated with a:
(Multiple Choice)
4.9/5
(70)
The Statistical Process Control (SPC)Chart was developed by ___________________________________ during the 1920s.This is a graphical procedure for determining whether a production process is operating properly.
(Short Answer)
4.9/5
(86)
Samples
Twenty-five samples of size 4 were taken from a production process.The mean of the sample means is = 13.9.The process standard deviation is known to be = 3.5.The sample means are listed below. Sample 1 2 3 4 5 6 7 8 9 10 11 12 13 15.1 10.9 17.6 10.0 13.8 9.9 17.7 6.1 5.9 16.9 11.1 12.1 9.4 Sample 14 15 16 17 18 19 20 21 22 23 24 25 13.2 11.1 16.9 9.3 10.0 12.0 18.2 21.1 21.7 16.9 19.1 21.5
-Is the process under control? Discuss.
(Essay)
4.8/5
(78)
Six Sigma is a philosophy that focuses on small,ongoing improvements rather than relying on large-scale innovations,such as might come from advances in technology or equipment.
(True/False)
4.9/5
(73)
Bottles
A bottle filling machine fills bottles with 16 oz of soda.Each hour,3 bottles are weighed on a precision scale to determine if the process is under control.The following data has been collected from the last 4 hours.Each value in the table represents the weight of an individual bottle.
Time Bottle 1 Bottle2 Bottle 3 7AM 16.3 16.4 15.8 16.0 16.2 16.4 9 AM 15.7 16.1 16.3 16.0 15.9 16.2
-Assuming this data was collected when the process was operating satisfactorily,construct 3-sigma limits for the mean chart.
(Short Answer)
4.8/5
(75)
Although both statistical process control (SPC)and acceptance sampling make inferences on the basis of samples,SPC uses sampled products to make inferences about a larger population of the products,while acceptance sampling uses the sampled products to make inferences about the process from which they came.
(True/False)
4.9/5
(97)
What is a "check sheet" and what is its role in total quality management?
(Essay)
4.7/5
(78)
Twenty-five samples of size 4 were drawn from a production process. For each sample, the mean and range were computed as shown below.
Sample 1 2 3 4 5 6 7 8 9 10 11 12 13 21 24 20 18 20 21 23 25 15 20 25 21 4 8 12 7 19 6 11 8 8 7 13 9 13 25 Sample 14 15 16 17 18 19 20 21 22 23 24 25 28 14 22 24 26 19 14 28 17 26 29 15 12 14 17 8 21 12 14 11 7 15 21 19
-Does it appear that the process is under control? Explain.
(Essay)
4.9/5
(83)
When a given process is operating properly,the percentage of defectives is 10%.For a 3-sigma p-chart in which the upper and lower control limits are 4 percentage points apart,how large will each sample have to be?
(Short Answer)
4.9/5
(87)
When the purpose of sampling is to detect when a process becomes too variable,the chart of choice will be an R chart.
(True/False)
4.9/5
(94)
Costs of preventing poor quality are also known as ____________________.
(Short Answer)
4.9/5
(77)
Random samples
Random samples of 200 parts were taken on an assembly line every hour for the past 25 hours. The number of defective parts is shown in the accompanying table.
Sample 1 2 3 4 5 6 7 8 9 10 11 12 13 Number of defectives 5 2 4 10 2 6 8 2 0 5 12 11 8 Sample 14 15 16 17 18 19 20 21 22 23 24 25 Number of defectives 10 5 13 7 5 7 11 3 16 3 2 10
-Calculate the centerline and control limits for the p-chart.
Centerline = ____________________
Lower value = ____________________
Upper value = ____________________
(Short Answer)
4.9/5
(89)
If six points in a row are all headed either upward or downward,or if nine points in a row are on the same side of the centerline,the process is judged to be out of control.
(True/False)
4.9/5
(91)
Showing 61 - 80 of 132
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)