Exam 9: Material Requirements Planning
Exam 1: Operations and Supply Chain Management84 Questions
Exam 2: Strategy and Sustainability54 Questions
Exam 3: Forecasting101 Questions
Exam 4: Strategic Capacity Management64 Questions
Exam 5: Projects77 Questions
Exam 6: Manufacturing and Service Processes73 Questions
Exam 7: Service Processes85 Questions
Exam 8: Sales and Operations Planning65 Questions
Exam 9: Material Requirements Planning89 Questions
Exam 10: Quality Management and Six Sigma149 Questions
Exam 11: Inventory Management108 Questions
Exam 12: Lean Supply Chains73 Questions
Exam 13: Global Sourcing and Procurement78 Questions
Exam 14: Location, Logistics, and Distribution61 Questions
Select questions type
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become more "lumpy."
(True/False)
4.9/5
(70)
Under the lot-for-lot (L4L)lot sizing technique as used in MRP,we would expect which of the following?
(Multiple Choice)
4.9/5
(67)
Which of the following is an input to the master production schedule (MPS)?
(Multiple Choice)
4.9/5
(86)
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
(True/False)
4.8/5
(91)
A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.
(True/False)
4.8/5
(80)
What are the three main inputs to an MRP program?
1._______________
2._______________
3._______________
(Short Answer)
4.7/5
(76)
Which of the following is an input file necessary to run an MRP system?
(Multiple Choice)
4.9/5
(87)
If annual demand is 6,125 units,annual holding cost is $5 per unit,and setup cost per order is $50,which of the following is the EOQ lot size?
(Multiple Choice)
4.8/5
(77)
Which of the following is one of the main purposes of a MRP system?
(Multiple Choice)
4.9/5
(63)
The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
(True/False)
4.9/5
(96)
Which of the following is considered a secondary report in an MRP system?
(Multiple Choice)
4.8/5
(84)
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
(True/False)
5.0/5
(84)
The time-phased plan specifying how many and when the firm plans to build each end item is called what? ___________________________________________
(Short Answer)
4.9/5
(80)
What is the planned-order release using an MRP program if the gross requirement is 1,600 and the inventory on hand is 600? ______________________________
(Short Answer)
4.7/5
(75)
The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.
(True/False)
4.8/5
(76)
What is the name for a bill of materials that includes items with fractional options? __________________________
(Short Answer)
4.8/5
(78)
Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal?
(Multiple Choice)
4.9/5
(84)
Which of the following industry types have high expected benefits from the application of MRP?
(Multiple Choice)
4.8/5
(80)
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
(True/False)
5.0/5
(89)