Exam 4: Strategic Capacity Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In solving a decision tree problem,calculations start at the ends of the "branches" of the tree and work backwards to the base of the tree.

Free
(True/False)
4.8/5
(84)
Correct Answer:
Verified

True

Capacity flexibility means having the ability to rapidly increase or decrease production levels,or to shift production capacity quickly from one product or service to another.

Free
(True/False)
4.7/5
(77)
Correct Answer:
Verified

True

The larger the capacity cushion the better.

Free
(True/False)
4.7/5
(71)
Correct Answer:
Verified

False

When a firm's design capacity is less than the capacity required to meet its demand,it is said to have a negative capacity cushion.

(True/False)
5.0/5
(87)

The way to build in greater flexibility in your workers is to do which of the following?

(Multiple Choice)
4.7/5
(81)

Because services cannot be stored for later use,service managers consider time as one of their supplies or resources.

(True/False)
4.9/5
(85)

A chance node on a decision tree has four possible outcomes each worth $100,000.The probabilities of the outcomes occurring are assessed as 10%,27%,43% and 20%.What is the expected value of this chance node? ____________________

(Short Answer)
4.7/5
(83)

Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.

(True/False)
4.7/5
(93)

The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's short-range competitive strategy.

(True/False)
4.7/5
(77)

What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?

(Multiple Choice)
4.8/5
(84)

Overtime and personnel transfers are solutions to capacity problems in the intermediate term.

(True/False)
4.8/5
(83)

If the actual output of a piece of equipment during an hour is 500 units and it's best operating level is at a rate of 400 units per hour,which of the following is the capacity utilization rate?

(Multiple Choice)
4.9/5
(74)

Low rates of capacity utilization in service organizations are never appropriate.

(True/False)
4.9/5
(85)

The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.

(True/False)
4.8/5
(82)

At a decision point in a decision tree,which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%;the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?

(Multiple Choice)
4.8/5
(85)

Best operating level is the volume of output at which average unit cost is minimized.

(True/False)
4.9/5
(73)

Capacity planning is generally viewed in three time durations: Immediate,Intermediate and Indeterminate.

(True/False)
4.9/5
(84)

Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

(Multiple Choice)
4.9/5
(69)

Sharing capacity is a common source of external capacity.

(True/False)
4.7/5
(80)

The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

(Multiple Choice)
4.8/5
(82)
Showing 1 - 20 of 64