The product-process matrix shows the relationship between process structures and product volume and variety characteristics.

Free
(True/False)
5.0/5
(85)
Correct Answer:
Verified

True

According to Little's Law,which of the following ratios is used to find throughput rate?

Free
(Multiple Choice)
4.7/5
(91)
Correct Answer:
Verified

D

A difference between project and continuous flow categories of process flow structures is which two of the following?

Free
(Multiple Choice)
4.9/5
(87)
Correct Answer:
Verified

A

Break-Even Analysis can only be used in production equipment decision making when dealing solely with fixed costs,no variable costs.

(True/False)
4.9/5
(72)

The time needed to respond to a customer's order is called the customer response time.

(True/False)
5.0/5
(79)

If the sum of the task times required to produce a product is 80 minutes and the cycle time for the same product is 15 minutes,the theoretical minimum number of workstations is 8 using the assembly-line balancing procedure.

(True/False)
5.0/5
(74)

The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.

(True/False)
4.7/5
(77)

Little's law can be thought of as a relationship between units and time.

(True/False)
4.8/5
(73)

In balancing an assembly line,workstation cycle time has to be less than the time between successive units coming off the end of the line.

(True/False)
4.8/5
(89)

The assembly-line balancing procedure determines the precedence relationships of manufacturing tasks.

(True/False)
4.7/5
(86)

The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.

(True/False)
4.9/5
(83)

Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?

(Essay)
4.7/5
(84)

One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.

(True/False)
4.8/5
(79)

A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.

(True/False)
4.8/5
(75)

Using the assembly-line balancing procedure,which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?

(Multiple Choice)
4.8/5
(75)

A make-to-order firm will work with the customer to design the product,and then make it from purchased materials,parts,and components.

(True/False)
4.7/5
(80)

When balancing an assembly line,which of the following is not a way to reduce the longest task time below the required workstation cycle time?

(Multiple Choice)
4.8/5
(83)

The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.

(True/False)
4.8/5
(77)

The term "assembly line" refers to progressive assembly linked by some material handling device.

(True/False)
4.9/5
(81)

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.

(True/False)
4.9/5
(86)