Exam 9: Material Requirements Planning
Exam 1: Operations and Supply Chain Management84 Questions
Exam 2: Strategy and Sustainability54 Questions
Exam 3: Forecasting101 Questions
Exam 4: Strategic Capacity Management64 Questions
Exam 5: Projects77 Questions
Exam 6: Manufacturing and Service Processes73 Questions
Exam 7: Service Processes85 Questions
Exam 8: Sales and Operations Planning65 Questions
Exam 9: Material Requirements Planning89 Questions
Exam 10: Quality Management and Six Sigma149 Questions
Exam 11: Inventory Management108 Questions
Exam 12: Lean Supply Chains73 Questions
Exam 13: Global Sourcing and Procurement78 Questions
Exam 14: Location, Logistics, and Distribution61 Questions
Select questions type
The master production schedule states the number of items to be produced during specific time periods.
(True/False)
4.9/5
(80)
Which of the following industry types have high expected benefits from the application of MRP?
(Multiple Choice)
4.9/5
(77)
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000,inventory on hand is 1,200 and planned receipts are 800?
(Multiple Choice)
4.9/5
(95)
Which of the following is a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost?
(Multiple Choice)
4.8/5
(75)
Which of the following is considered a primary report in an MRP system?
(Multiple Choice)
4.8/5
(77)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?
(Multiple Choice)
4.8/5
(81)
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost and carrying cost.
(True/False)
4.8/5
(88)
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.8/5
(71)
Which of the following is considered a primary report in an MRP system?
(Multiple Choice)
4.7/5
(81)
What is the name for demand caused by the demand for a higher level item? __________________________
(Short Answer)
4.9/5
(82)
A modular bill of materials includes items with fractional options.
(True/False)
4.9/5
(72)
In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
(True/False)
5.0/5
(86)
The economic order quantity (EOQ)lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
(True/False)
4.7/5
(86)
Which of the following can be used for lot sizing in an MRP system?
(Multiple Choice)
4.9/5
(91)
An input to the material requirements planning (MRP)system is an inventory records file.
(True/False)
4.8/5
(72)
The time-phased plan specifying how many and when the firm plans to build each end item is called the Materials Requirements Plan (MRP. )
(True/False)
4.7/5
(72)
Demand for an item located in level 3 of a product structure tree depends on demand for an item in the next higher level.What is that level called? __________________________
(Short Answer)
4.9/5
(93)
Showing 21 - 40 of 89