Exam 11: Quality Improvement Methods
Exam 1: Operations and Supply Chain Strategy74 Questions
Exam 2: Quality Management75 Questions
Exam 3: New Product Development75 Questions
Exam 4: Process Design and Analysis75 Questions
Exam 5: Forecasting75 Questions
Exam 6: Independent Demand Inventory75 Questions
Exam 7: Dependent Demand Inventory74 Questions
Exam 8: Project Management75 Questions
Exam 9: Optimization and Simulation Modeling75 Questions
Exam 10: Capacity Planning75 Questions
Exam 11: Quality Improvement Methods75 Questions
Exam 12: Lean Enterprise75 Questions
Exam 13: Technology and Integrated Supply Management75 Questions
Exam 14: Global Supply Chain and Service Integration75 Questions
Select questions type
On a SPC chart,if a data point falls outside the control limits,the process is said to be what?
(Multiple Choice)
4.8/5
(78)
Which of the following is a quantitative quality improvement tool?
(Multiple Choice)
4.7/5
(83)
When only natural variations are present,an SPC chart will seldom show a point outside of control limits.
(True/False)
4.9/5
(94)
When implementing a quality improvement plan,it is important to understand the constraints that might prevent the organization from achieving its goals.
(True/False)
4.8/5
(73)
Using students from one class would provide a simple random sample for all university students.
(True/False)
5.0/5
(93)
Which of the following is not a common source of customer feedback?
(Multiple Choice)
4.9/5
(79)
A single point outside of control limits is sufficient to determine a process is out of control.
(True/False)
4.8/5
(76)
Critical evaluation of ideas is an important first step when brainstorming.
(True/False)
4.9/5
(91)
A Pareto analysis suggests that 20 percent of the problems are produced by 80 percent of the causes.
(True/False)
4.7/5
(85)
A structured process for comparing business practices is known as what?
(Multiple Choice)
4.8/5
(78)
Deming's Plan Do Check Act cycle is a series of steps that are systematically implemented in a quality improvement plan.
(True/False)
4.8/5
(69)
Air pressure must be in a tight range for the proper performance of aerosol air fresheners.Engineering specifications call for 50 psi of pressure with an upper tolerance of 55 psi and a lower tolerance of 45 psi.A sample from the previous week's production had an average 51 psi and a standard deviation of 1.5 psi.What is the capability of the process?
(Essay)
4.7/5
(84)
If the upper tolerance limit for the capability index is 1.029 and the lower tolerance limit for the capability index is 1.496,the Cpk for the process is what value?
(Multiple Choice)
4.7/5
(89)
When a percentage of measurements fall outside specification limits,the process is capable.
(True/False)
4.8/5
(79)
Showing 61 - 75 of 75
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)