Exam 10: Capacity Planning
Exam 1: Operations and Supply Chain Strategy74 Questions
Exam 2: Quality Management75 Questions
Exam 3: New Product Development75 Questions
Exam 4: Process Design and Analysis75 Questions
Exam 5: Forecasting75 Questions
Exam 6: Independent Demand Inventory75 Questions
Exam 7: Dependent Demand Inventory74 Questions
Exam 8: Project Management75 Questions
Exam 9: Optimization and Simulation Modeling75 Questions
Exam 10: Capacity Planning75 Questions
Exam 11: Quality Improvement Methods75 Questions
Exam 12: Lean Enterprise75 Questions
Exam 13: Technology and Integrated Supply Management75 Questions
Exam 14: Global Supply Chain and Service Integration75 Questions
Select questions type
The effective capacity can be maintained for an extended period of time.
Free
(True/False)
4.9/5
(82)
Correct Answer:
True
An experience curve displays the relationship between total direct labor per unit and
Free
(Multiple Choice)
4.7/5
(73)
Correct Answer:
C
Put the following steps for assessing future capacity needs in the correct order. 
Free
(Multiple Choice)
5.0/5
(76)
Correct Answer:
B
Experience curves generally display a linear relationship between labor and quantity produced.
(True/False)
4.9/5
(72)
Yield management is probably not effective for which of the following items?
(Multiple Choice)
4.8/5
(84)
A local company supplies city schools with supply packages.How many assembly lines are needed if the company works 10 hours a day during July to meet demand.They wish to have a 20% capacity cushion.How many assembly lines should they have?

(Essay)
4.7/5
(68)
The Home-Cooking Gourmet provides four meal packs that can be prepared at home in four minutes.Each meal pack is prepared on a separate production line.The company works five days per week with a single shift for 8 hours.Management wants a 20% capacity cushion.All meals can be prepared on a standard assembly line.Assembly lines are added on the basis of demand.How many production lines are required for the following parameters?

(Essay)
4.9/5
(86)
In services,capacity must be available when the customer wants the service.
(True/False)
4.7/5
(83)
What are the implications for utilization if the maximum capacity is increased,and everything else remains constant?
(Multiple Choice)
4.8/5
(77)
When is an aggressive expansion strategy most advantageous?
(Multiple Choice)
5.0/5
(88)
Revenue management focuses on maximizing revenue rather than simply maximizing utilization.
(True/False)
4.9/5
(85)
The more variation a company has in demand,the easier it is to determine the capacity requirement of a facility.
(True/False)
4.9/5
(76)
A difference between projected demand and current capacity is
(Multiple Choice)
4.8/5
(76)
The school supply company can process any of the course packs for shipping in the same amount of time,shown below.Should additional processing or shipping be expanded? That is,what is the bottleneck in this operation?

(Essay)
4.9/5
(69)
A bottleneck is the step in a process that has the longest cycle time.
(True/False)
4.9/5
(84)
As service utilization increases,what will the effect on quality be?
(Multiple Choice)
4.8/5
(94)
Showing 1 - 20 of 75
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)