Exam 17: Cycle-Time Management Increases Productivity
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
Balance delay is characterized as a system measure of idle time because it takes the ratio of total idle time to the total work content of the job.
(True/False)
4.8/5
(73)
_____ heuristic first assigns to stations those operations whose followers have the largest total time.
(Multiple Choice)
4.9/5
(83)
Which of the following systems can be described as an input-output system with variable arrivals and variable service times?
(Multiple Choice)
5.0/5
(75)
_____ create bottlenecks that cause disruptive backups of WIP to form.Such events can be costly.
(Multiple Choice)
4.9/5
(84)
The participation of people at the workstations in manufacturing,service systems,and along the supply chain decreases variability of output rates.
(True/False)
4.9/5
(78)
Cycle time (CT) provides a measure of the input rates of different parts of the system.
(True/False)
4.8/5
(69)
Decreasing cycle time by working smarter has the effect of increasing productivity,decreasing the breakeven point,and increasing the system's effective capacity.
(True/False)
4.9/5
(96)
Cycle-time management is the aspect of _____ that applies to running a better production process for a flow shop.
(Multiple Choice)
4.8/5
(82)
Rho (r) is the maximum percent of time that the station is providing service.
(True/False)
4.9/5
(85)
Line balancing synchronizes material flows by randomly assigning required resources.
(True/False)
4.9/5
(80)
_____ is a transporter,usually a belt,that moves materials between workstations at a fixed rate of speed (station stop-times equal cycle time).
(Multiple Choice)
4.8/5
(77)
Cycle time must be the length of time that a unit spends at each stop point along the production line.
(True/False)
4.9/5
(83)
Which of the following calls attention to a workstation's need to receive a just-in-time delivery?
(Multiple Choice)
4.9/5
(70)
The big systems perspective connects customers' demand rate and suppliers' delivery rates with management's control over production output cycle time.
(True/False)
4.8/5
(77)
_____ is the interval of time that elapses between successive units of finished product coming off the production line.
(Multiple Choice)
4.8/5
(87)
Competitive advantage is gained by firms that can _____ the cycle time of an established process.
(Multiple Choice)
4.8/5
(82)
The task time at a station can exceed the allotted time.A plan is needed to act on this problem.Which of the following choices is a reasonable alternative?
(Multiple Choice)
4.7/5
(90)
Precedence diagrams are important graphic displays that show various ways of ordering the steps necessary to complete operations.
(True/False)
4.8/5
(85)