Balance delay is characterized as a system measure of idle time because it takes the ratio of total idle time to the total work content of the job.

(True/False)
4.8/5
(73)

_____ heuristic first assigns to stations those operations whose followers have the largest total time.

(Multiple Choice)
4.9/5
(83)

The decision to use just-in-time deliveries alters:

(Multiple Choice)
4.8/5
(78)

Which of the following systems can be described as an input-output system with variable arrivals and variable service times?

(Multiple Choice)
5.0/5
(75)

_____ create bottlenecks that cause disruptive backups of WIP to form.Such events can be costly.

(Multiple Choice)
4.9/5
(84)

The participation of people at the workstations in manufacturing,service systems,and along the supply chain decreases variability of output rates.

(True/False)
4.9/5
(78)

Cycle time (CT) provides a measure of the input rates of different parts of the system.

(True/False)
4.8/5
(69)

Decreasing cycle time by working smarter has the effect of increasing productivity,decreasing the breakeven point,and increasing the system's effective capacity.

(True/False)
4.9/5
(96)

Cycle-time management is the aspect of _____ that applies to running a better production process for a flow shop.

(Multiple Choice)
4.8/5
(82)

Rho (r) is the maximum percent of time that the station is providing service.

(True/False)
4.9/5
(85)

Line balancing synchronizes material flows by randomly assigning required resources.

(True/False)
4.9/5
(80)

_____ is a transporter,usually a belt,that moves materials between workstations at a fixed rate of speed (station stop-times equal cycle time).

(Multiple Choice)
4.8/5
(77)

Cycle time must be the length of time that a unit spends at each stop point along the production line.

(True/False)
4.9/5
(83)

Which of the following calls attention to a workstation's need to receive a just-in-time delivery?

(Multiple Choice)
4.9/5
(70)

The big systems perspective connects customers' demand rate and suppliers' delivery rates with management's control over production output cycle time.

(True/False)
4.8/5
(77)

_____ is the interval of time that elapses between successive units of finished product coming off the production line.

(Multiple Choice)
4.8/5
(87)

Competitive advantage is gained by firms that can _____ the cycle time of an established process.

(Multiple Choice)
4.8/5
(82)

Cycle time must be

(Multiple Choice)
4.7/5
(80)

The task time at a station can exceed the allotted time.A plan is needed to act on this problem.Which of the following choices is a reasonable alternative?

(Multiple Choice)
4.7/5
(90)

Precedence diagrams are important graphic displays that show various ways of ordering the steps necessary to complete operations.

(True/False)
4.8/5
(85)