Exam 7: Quality Assurance

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Continuing with casual analysis,after the fishbone diagram is considered complete,it is reasonable to determine what variations of cause and effect should be tested.

Free
(True/False)
4.9/5
(73)
Correct Answer:
Verified

True

_____ show at a glance what factors affect quality and thereby what may be the causes of quality problems.

Free
(Multiple Choice)
4.9/5
(79)
Correct Answer:
Verified

C

Some problems arise during inspection of the product while it is on or just about to leave the production line.

Free
(True/False)
4.9/5
(76)
Correct Answer:
Verified

True

The double-sampling plan requires two acceptance numbers c₁ and c₂ such that c₁ > c₂.

(True/False)
4.8/5
(86)

_____ encompasses statistical process control as well as other statistical methods,including acceptance sampling.

(Multiple Choice)
4.8/5
(96)

The appropriate _____ is to abhor defectives and do as much as feasible to prevent them from occurring.

(Multiple Choice)
4.8/5
(87)

The p-chart monitors the stability of the range.

(True/False)
4.9/5
(82)

_____ is defined as the process of quality attainment that starts with detection of problems.This is followed by diagnosis of causes of problems,prescription of corrective actions to treat problems,and follow-up through observation and evaluation.

(Multiple Choice)
5.0/5
(91)

The first step of control charting is

(Multiple Choice)
4.8/5
(71)

_____ is when output units are classified as accepted or rejected,usually by some form of inspection device that only distinguishes between a "go" or "no go" situation.

(Multiple Choice)
4.8/5
(69)

Even people who are turned off by tables of numerical data are often willing to study a

(Multiple Choice)
5.0/5
(61)

Control chart steps include diagnosing the causes of process instability,removing the causes of process instability,but do not include checking the results.

(True/False)
4.8/5
(85)

Inspections and inspectors reduce defectives made.They do not reduce defectives shipped.

(True/False)
4.9/5
(88)

A _____ of numbers on any control chart is a succession of values that fall either above or below the mean line.

(Multiple Choice)
4.9/5
(94)

Method 6,of the seven QC methods,covers the preparation and employment of statistical quality control charts and is the most elaborate and powerful approach of all methods.

(True/False)
4.8/5
(79)

_____ is defined as the policy that requires eliminating any and all causes of defects.

(Multiple Choice)
4.8/5
(73)

Process charts play a crucial role in causal analysis.

(True/False)
4.9/5
(101)

For the _____ to apply,the sample size should be small as compared to the lot size.

(Multiple Choice)
4.9/5
(82)

The relationship between the variability of a stable parent distribution and that of the distribution of the sample means is known as the central limit theorem.

(True/False)
5.0/5
(81)

Acceptance sampling involves trade-offs that balance the cost of sampling against the risk of accepting more defectives than permissible.

(True/False)
4.7/5
(76)
Showing 1 - 20 of 115
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)