Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What information system would require current data for the following items: stock on-hand levels,suppliers' prices,and delivery lead times?

(Multiple Choice)
4.9/5
(86)

For the example in the text (see Table 15-4),when the master production schedule calls for various output amounts of _____ and _____ DVR models,the MRP must combine the demands of commonly shared parts.

(Multiple Choice)
4.9/5
(83)

One unit of product A is made from two units of B and four units of C.One unit of component B is made from two units of D and three units of E.One unit of component C is made with three units of D and two units of F.Show a single-level bill of materials and an indented bill of materials.

(Essay)
4.8/5
(86)

In a _____ model the idea is to decrease the number of orders to minimize inventory costs.

(Multiple Choice)
4.8/5
(85)

DRP2 operates as an extension of DRP1 by identifying those additional resources that will be needed in the distribution system.

(True/False)
4.8/5
(94)

Using MRP II,financial planning can access and control what is being done and determine what will be done in the future.

(True/False)
4.7/5
(94)

Capacity requirements planning is generally applied to long-term modifications for capacity problems that are encountered as a result of infeasible MRP plans.

(True/False)
4.9/5
(92)

_____ models are powerful as long as the assumptions for continuity hold true.

(Multiple Choice)
4.8/5
(67)

_____ helps to keep problems from arising by documenting the time-phasing for all parts that are needed.

(Multiple Choice)
5.0/5
(70)

Master production schedules are partially driven by

(Multiple Choice)
4.9/5
(76)

Modular ATOs are organized so that product options can serve in place of single-product parents.To emphasize the point,modular BOMs do not exist.

(True/False)
4.9/5
(82)

DRP is most similar to:

(Multiple Choice)
4.8/5
(88)

A bill of material is used in conjunction with the master production schedule to determine the items for which purchase requisitions and production orders must be released.

(True/False)
4.9/5
(80)

Exception codes are used to identify important items.

(True/False)
4.9/5
(94)

What is net change MRP?

(Essay)
4.8/5
(78)

MRP II entails total manufacturing resource planning as part of the strategic business plan.

(True/False)
4.8/5
(86)

Transient or phantom BOMs are used for subassemblies that are not kept in stock.

(True/False)
4.8/5
(89)

In an ATO inventory environment,it is often the case that the number of _____ is smaller than the number of _____ products,and master production schedules operate at the components or subassembly levels.

(Multiple Choice)
5.0/5
(81)

Master production scheduling converts strategic plans into a time-phased plan that indicates exactly when each SKU should be made and how much should be run.

(True/False)
4.9/5
(76)

What are the three inputs to MRP?

(Essay)
4.8/5
(79)
Showing 81 - 100 of 116
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)